Loading...
WA9302-LR 951102 (5)['~'EOTECHNICAL E GEE Consultants, inc. E ~NVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: November 2, 1995 Date Concrete Placed: October 3, 1995 Standard 6"x12" Client: City of Coppell Area 28.27 Square Inches Project: 6.0 Million Gallon Water Storage Tank concrete Report No.: 21 Con_tractor: Natgun Construction Project No. ! 95-0196 Concrete Supplier and Plant: RediMix Concrete - Plant//1 Location of Placement: Piers MATERIALS se~, ~" '~' INSPECTION DATA Description (lbs./0.075 C.Y) Mix Number: 686 Time Sample Bateheal: 7:53 am Cement: Time Sampled: 8:40 am Fly Ash: Sample Location: Pier B-7 Truck/Ticket No: 124/11718 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 50°F Fine Aggregate: Concrete Range: 55°F Admixtures: Slump Range (inches): 4 V~" Weather Conditions: Sunny 1 Time Started: 2 Time Completed: Added Water: Sample Air Content (%): No Test Total Cubic Yards Placed: 8.0 C.Y. Required Strength (Lbs./sq.in.): 4,000 Specimen Measured Age Date Total Load Compressive Strength Remarks Number Slump (in.) (Days) Tested (Lbs.) CLbs./Sq.ln.) CWT 85 4V2" 7 10/10/95 128,760 4,550 CWT 86 4~/~'' 7 10/10/95 134,560 4,760 CWT 87 4~h'' 28 10/31/95 168,440 5,960 CWT 88 4~h'' 28 10/31/95 172,200 6,090 Test Methods Utilized Fracture Regular ASTM C-31,C-39,C-143 (Unless Noted Otherwise) Cylinders Made By: P.Chen Remarks and/or Distribution: cc: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Henchicks - Shimek, Jacobs and Finldea Mr. Gary Herron - RediMix Concrete ~_~~Ld ~ GBR consultents, Inc. Reviewed by: ~ ~'