Loading...
Lam Lee Add-LR000608 (2) CONCRETE INSPEC I'ION AND COMPRESSION TF_. T REPORT Client Alice Lee c/oRealty Capital Corporation Work Order Numbe 00-1978 Project 00-014 Lam Lee Report Numbe 00-014.222 SPECIFICATIONS PROJECT DATA Strength (psi): 4000 Date of Placement: 6/8/00 Slump(in.): ;4 +/-1 Sampled by: Anthony =Air Content(%): na iWeather. Clear Concrete Temp(F): [90 iSupplier/Mix: iPioneer FIELD DATA SET # 3. Ticket #: 508900 iTime Batched: 4:30:00 AM Time Sampled: 5:00:00 AM Slump (in.): I 5 iAir Content: na Unit Weight (pcf): na Concrete Temp(F): ' 86 Air Temp (F): 70 Yardage: 10 Location/Remarks: !Leaveout inside of building along East wall, 10' North of South line SETi CYLINDER i DATE AGE MAX LOAD ISTRENGTH TEST ! CYLINDER NOTES NO. i NO. i TESTED (days) (lbs) (psi) RESULT! SOURCE i 1 6/15/00; 7 i 91000 3220 Other ' 7~6~00 ' .......................... 1 2 28 t 127000 4490 ........... 1 3 !716100 28 i 127000 4490 1 4 : Discard' FIELD DATA SET #2 Ticket #: 505913 iTime Batched: 7:10:00 AM !Time Sampled: 9:00:00 AM Slump (in.): 4 iAir Content: na !Unit Weight (pcf): ~ na Concrete Temp(F): 80 !Air Temp (F): 75 Yardage: 90 Location/Remarks: Southeast middle of parking lot SET CYLINDER DATE AGE MAX LOAD STRENGTH. TEST CYLINDER NOTES NO. NO. TESTED (days) (lbs) (psi) RESULT SOURCE 2 i '6115~00 7 74000 2620 iOther 2 2 '7/6/00 28 i 100000 ~ 3540 ; 2 3 7/6/00 28 114000 4030 2 4 Discard NORMAL CYLINDER SIZE: 5X12, AREA:28.27sq. in, UNLESS NOTED HERE: TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED "NON-COMPLIANCE" IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172. C231. CYLINDERS MOLDED AND CURED BY SOILTECH ENGINEERING AND TESTING, INC ARE PER ASTM C31, TESTED PER ASTM EN E ERI AND. TESTING, INC. J'~,~l~es M. Perdue G"enera I Manager 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax