Lam Lee Add-LR000622 (2) CONCRETE INSPECTION AND COMPRESSION TEST REPORT
Client Alice Lee c/oRealty Capital Corporation Work Order Number: 00-2].:[3
Project 00-0].4 Lam Lee Report Numbe 00-014.225
SPECIFICATIONS PROJECT DATA
Strength (psi): 14000 [Date of Placement: !6122/00
!Slump(in.): 15 Sampled by: !=D. Rogers
iAir Content(%): ina Weather:. Clear
iConcrete Temp(F): Supplier/Mix: -
Pioneer
9349
FIELD DATA SET # 1
~iTicket #: 509283 ITime Batched: i 10:00:00 AM iTime Sampled: 10:30:00 AM
iSlump (in.): 5 ~ir Content: ,I ilUnit Weight (pc0:
[Concrete Temp(F}: 74 1Air Temp (F): 76 IYardage: 10
IrLocation/Remarks: Slab leaveout office building, 4' from Northwest corner
SET CYLINDER ! DATE AGE MAX LOAD ~STRENGTH TEST CYLINDER NOTES
NO, NO. !TESTED i (days) (lbs) (psi) RESULT SOURCE
1 I i6/29/00! 7 102500 3630
i 2 i7/20/00 28 148000 i 5240
1 3 i7/20/00 28 i 144000 [ 5090
1 i 4 Discard!
' i
NORMAL CYLINDER SIZE: 5X12, AREA:28.27sq. in. UNLESS NOTED HERE: TYPE "A" CONE FRACTURE UNLESS INDICATED OTHER1MSE IN NOTES. TEST RESULTS COMPLY
WITH PROJECT SPECIFICATIONS UNLESS INDICATED 'I'ION-COMPLIANCE" IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER APPLICABLE
AS'TM STANDARDS: C138, C143, C172, C231. CYLINDERS MOLDED AND CURED BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER ASTM C31, TESTED PER ASTM
SOILIECH ENGiNE~RINI~ND TESTING, INC.
5~O;~s M. Perdue
General Manager
2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817,595.0708 fax