Lam Lee Add-LR000628 (2) CONCRETE INSPECTION AND COMPRESSION TEST REPORT
Client Alice Lee c/oRealty Capital Corporation Work Order Numbe 00-2:102
Project 00-0].4 Lam Lee Pig ]. of 2 Report Numbe 00-0].4.228
SPECIFICATIONS = PROJECT DATA
Strength (psi): ~4000 iDate of Placement: 6/28/00
Slump(in.): 5 iSampled by: -- *Anthony Liv-el~, .........
=~Weather: Overcast
Air Content(%): 13 - 6 t
Concrete Temp(F): [Not to exceed 90 ISupplier/MiX:l !Pioneer - 9351
FIELD DATA SET # !
Ticket #: i 509448 Time Batched: 3:30:00 AM iTin~e~pled: 4:10:00 AM
[ 5 !Air Content: 4.8 lUnit Weight (pcf): na
Slump (in.): i
Concrete Temp(F): i 80 Air Temp (F): 74 'Yardage: 20
Location/Remarks: ISouth fire lane paving, S. end of building, 10' from S. end and 5' E. of W. end
SET CYLINDER! DATE AGE ~ MAX LOAD ISTRENGTH TEST CYLINDER NOTES
NO. NO. TESTED (days) (lbs) (psi) RESULT SOURCE
1 1 7/5/00 7 120000 4240
1 2 !7/26/00 28
1 3 i7/26/00 28
1 4 Hold
FIELD DATA SET #2
Ticket #: 509456 iTime Batched: 4:30:00 AM !Time Sampled: 5:15:00 AM
Slump (in.): 5 ~ir Content: 4.8 iUnit Weight (pcf): na
Concrete Temp(F): 85 [Air Temp (F): 78 !Yardage: 100
Location/Remarks: 20' North of SE corner and 10' East of West end
SET CYLINDER: DATE AGE MAX LOAD STRENGTH TEST CYLINDER NOTES
NO. NO. :TESTED (days) (lbs) (psi) RESULT SOURCE
2 1 i 7/5/00 7 116000 4100
2 2 ! 7/26/00 28
2 3 7/26/00 28
2 4 Hold
NORMAL CYLINDER SIZE: 5X12, ARE~28.27sq. in. UNLESS NOTED HERE: TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. TEST RESULTS COMPLY
W1TH PROJECT SPECIFICATIONS UNLESS INDICATED "NON-COMPLIANCE" IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER APPLICABLE
ASTM STANDARDS: C138, C143, C172, C231. CYLINDERS MOLDED AND CURED BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER ASTM C31, TESTED PER ASTM
k,J.~es M. Perdue
General Manager
2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax
CONCRETE INSPECTION AND COMPRESSION TE T REPORT
Client Alice Lee c/oRealty Capital Corporation Work Order Numbe 00-2102
Project 00-014 Lam Lee pg 2 of 2 Report Numbe 00-014.228
SPECIFICATIONS ~ PROJECT DATA
~Strength (psi): 14000 iDate of Placement: 16/28/00
Slump(in.): .5 iSampled by: iAnthony Lively
.Air Content(%): i3 - 6 iWeather: ;Overcest
iConcrete Temp(F): !Not to exceed 90 ISupplier/Mix: iPioneer - 9351
FIELD DATA SET #3
:Ticket #: 509428 1Time Batched: i 6:15:00 AM 'Time Sampled: 8:40:00 AM
~Slump (in.): 5 [Air Content: ~ 4.0 iUnit Weight (pcf): na
Concrete Temp(F): 87 !Air Temp (F): 89 ~Yardage: 220
Location/Remarks: 'Southwest comer, 15' North of South line and 3' East of West line
SET CYLINDER I DATE i AGE MAX LOAD ~STRENGTH TEST CYLINDER NOTES
NO. NO. TESTED I (days) (lbs) ~ (psi) RESULT SOURCE
3 :1 17/5/00[ 7 98500 3480
~ 3 2 i7/26/00 28
3 3 !,7126100 28
3 4 ! ~ Hold
FIELD DATA SET #4
Ticket #: 509478 ITime Batched: 8:51:00 AM Time Sampled: 9:45:00 AM
Slump (in.): 5 lair Content: 4.8 Unit Weight (pc0: na
iConcrete Temp(F): 87 [Air Temp (F): ~ 88 'Yardage: 300
'Location/Remarks: Northwest corner, 10' North of South end and 35' East of West end
SET CYLINDER DATE AGE MAX LOAD STRENGTH: TEST CYLINDER NOTES
NO. NO. TESTED (days) (lbs) (psi) RESULT SOURCE .
-- Z[ - :1 7/5/00 i 7 :[05000 37:10
4 2 '7/26/00i 28
4 3 7/26/00 28
4 4 [ Hold
NORMAL CYLINDER SIZE: 5X12, AREA:28.27Sq. in. UNLESS NOTED HERE: TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. TEST RESULTS COMPLY
WITH PROJECT SPECIFICATIONS UNLESS INDICATED "NON-COMPLIANCE" IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER APPLICABLE
ASTM STANDARDS: C138, C143, C172, C231. CYLINDERS MOLDED AND CURED BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER ASTM C31, TESTED PER ASTM
SOILTECH ENGINEERING AND TESTING, INC.
James M. Perdue
General Manager
2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax