July 26, 1996
Mark Wainseott
Wainscott & Associates, Inc.
16775 Addison Road, Suite 360
Dallas, TX 75248
RE: MacArthur Plaza Block 1, Lot 5 (Sonic) Revised
Development Fee Assessment
Dear Mr. Wainscott:
Enclosed is a copy of the revised City of Coppell Developmem Fee Assessment list, along with a
copy of the Development Fee calculations for MacArthur Plaza Block 1, Lot 5 (SonicL
Please make payment to the City of Coppell in the amount of $5,961.10 and forward it to Jennifer
Armstrong, Finance Director, along with a copy of the Fee Assessment list. A copy of the
Engineer's estimate or contract for this project will need to be provided to our department so the
construction inspection fee can be verified
Providing a copy of your paid receipt to our office will help us to verify payment of the required
fees and insure a successful beginning of this project. We look forward to working with you on this
project. If you have any questions, please do not hesitate to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Assistant City Manager/City Engineer
cc: Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
CITY OF COPPELL
DEVELOPMENT FEES
Date: July 26, 1996
Project: MacArthur Plaza Block 1, Lot 5 (Sonic) Revised
· ·
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee 3,375.00 3,375.00
(100% due prior to Council Approval)
Water Tap Inspection Fee 150.00 -0-
(100% due at Issuance of Water Meter)
Wastewater Impact Fee I, 125.00 1,125.00
(100% due prior to Council Approval)
Sewer Tap Inspection Fee 50.00 -0-
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee 50.00 -0-
(100% due at Issuance of Building Permit)
Water Meter Fee (Domestic) 48.30 -0-
(100% due at Issuance of Water Meter)
Water Meter Deposit (Non-residential) 30.00 -0-
(100% due at Issuance of Water Meters)
Water Meter Fee (Irrigation & Fire) 1,487.38 -0-
(100% due at Issuance of Water Meters)
Irrigation Meter Deposit 35.00 -0-
(100% due at Issuance of Water Meters)
Street Sign Fee -0- -0-
(100% due prior to Acceptance of Project)
Street Light Fee * information not -0-
(100% due prior to Acceptance of Project) available
Roadway Impact Fee 1,461.10 1,461.10
(100 % due prior to Council Approval)
Construction Inspection Fee (Due prior to precon, mtg.) need submittal of -0-
(2 % of project cost due for private improvements) contracts
(4 % of project cost due for public improvements)
TOTAL $ 7,811.78
I '
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 5,961.10
·
· This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan
is submitted, $292.60 per light will be assessed.
COPPEnn ENGINEERING
HEHORAHDUH
DATE: July 2, 1996
TO: Mike Martin, Assistant City Engineer
FROH: Matt M. Cast, Superintendent of Public Services
RE: Development Fees for Sonic - Macarthur Blvd. (REVISED)
The following fees should be assessed and collected on the above
referenced project.
Water Impact Fee:
- 1" Domestic Meter/s = 2.5 ESU's
i - 1" Irrigation Meter/s = 2.5 ESU's
1 - 6" Fireline Meter/s = 2.5 ESU's
Total 7.5 ESU's @ $450.00 ea = $3,375.00
100% due prior to Council approval of the final plat.
Wastewater Impact
1 - 1" Domestic Meter/s = 2.5 ESU's
Total 2.5 ESU's ~ $450.00 ea = $1,125.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
3 Connections ~ $50.00 each = $150.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
1 Connections ~ $50.00 each = $ 50.00
100% due prior to issuance of building permit.
Development Fees
Page 2
Utility Final Inspection Fee (Ail Development)
1 lots @ 5 50.00/Iot = 550.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
I - 1" Domestic Meters ~ 54S.30 = 548.$0
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee (Irrigation/Fireline)
1 - 1" Irrigation Meter/s ~ $48.30 ea = $48.30
1 - 6" Fireline Meter/s @ $ 1. 439.0Sea = Si. 439.08
Total Si. 487.38
100% due prior to issuance of water meter/s.
Water Meter Deposit (Multi-Family or Hon-Residential)
1 Meters ~ $30.00 ea = $30.00
100% due prior to issuance of water meters.
Irrigation Meter Deposit
2I Meters ~ 535.00 ea =
100% due prior to issuance of water meters.