Loading...
MacPlaza1 Sonic-CS 960617 Coppell, Texas 75019 ~ '~" .'~', The City With A Beautiful Future 214-462-0022 June 17, 1996 Dowdey, Anderson and Associates, Inc. 16250 Dallas Pkwy., Suite 100 Dallas, TX 75248 RE: MacArthur Plaza Block 1, Lot 5 (Sonic) Development Fee Assessment Dear Sir: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee calculations for MacArthur Plaza Block 1, Lot 5 (Sonic). Please make payment to the City of Coppell in the amount of $3,486.10 and forward it to Jennifer Armstrong, Finance Director, along with a copy of the Fee Assessment list. A copy of the Engineer's estimate or comract for this project will need to be provided to our department so the construction inspection fee can be verified Providing a copy of your paid receipt to our office will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Ori ~n, P.E. Assistant City Manager/City Engineer cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official CITY OF COPPELL - DEVELOPMENT FEES Date: June 17, 1996 Project: MacArthur Plaza Block 1, Lot 5 (Sonic) · TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee 1,575.00 1,575.00 (100% due prior to Council Approval) Water Tap Inspection Fee 100.00 -0- (100% due at Issuance of Water Meter) Wastewater Impact Fee 450.00 450.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee 50.00 -0- (100% due at Issuance of Building Permit) Utility Final Inspection Fee 50.00 -0- (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) 23.21 -0- (100% due at Issuance of Water Meter) Water Meter Deposit (Non-residential) 30.00 -0- (100% due at Issuance of Water Meters) Water Meter Fee (Irrigation & Fire) 48.30 -0- (100% due at Issuance of Water Meters) Irrigation Meter Deposit 35.00 -0- (100% due at Issuance of Water Meters) Street Sign Fee -0- -0- (100% due prior to Acceptance of Project) Street Light Fee * information not -0- (100% due prior to Acceptance of Project) available Roadway Impact Fee 1,461.10 1,461.10 (100% due prior to Council Approval) Construction Inspection Fee (Due prior to precon, mtg.) need submittal of -0- (2 % of project cost due for private improvements) contracts (4 % of project cost due for public improvements) TOTAL $ 3,822.61 · TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 3,486.10 · · · This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. COPPBLL ENGINEERING MEHORANDU~ DATE: June 6, 1996 TO: Mike Martin, Assistant City Engineer FROM: Ted Dutt, Interim Utilities Superintendent RE: Development Fees for Sonic - Lot 5 Blk. 1 Macarthur Plaza The following fees should be assessed and collected on the above referenced project. Water Impact Fee: 1 - 3/4" Domestic Meter/s = 1 ESU's 1 - 1" Irrigation Meter/s = 2.5 ESU's - Fireline Meter/s = ESU's Total 3.5 ESU's @ $450.00 ea = $1,575.00 100% due prior to Council approval of the final plat. Wastewater Impact 1 - 3/4" Domestic Meter/s = 1 ESU's Total 1 ESU's ~ $450.00 ea = $450.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 2 Connections ~ $50.00 each = SIO0.O0 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee 1 Connections ~ $50.00 each = $ 50.00 100% due prior to issuance of building permit. (Residential only) Development Fees Page 2 Utility Final Inspection Fee (Ail Development) 1 lots @ 5 50.O0/lot = 550.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 1 - 3/4" Domestic Meters @ 23.21 = 523.21 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) 1 - 1" Irrigation Meter/s @ 548.30 ea = $48.30 - Fireline Meter/s @ $ ea = 5 Total $48.30 100% due prior to issuance of water meter/s. Water Meter Deposit (Multi-F~m~ly or Non-Residential) 1 Meters ~ $30.00 ea = 530.00 100% due prior to issuance of water meters. Irrigation Meter Deposit 1 Meters @ $35.00 ea = 535.00 100% due prior to issuance of water meters. Sonic ROADWAY IMPACT FEE CALCULATIONS PRO3ECT: MacArthur Plaza, Lot 5, Block 1 (Sonic) DATE: 6/14/96 ROADWAY IMPACT FEE: Service Area * 7 Category ** Commercial Land Use ** Fast Food Restaurant Building Size (Sq. Ft.) 1,338 Development Units ** 1.338 Vehicle Miles per Development Unit ** 3.64 Fee per Vehicle Mile $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $1,461.10. · (Figure 2 - Roadway Impact Fee Study) · * (Table 3 - Roadway Impact Fee Study)