Lam Lee Add-LR000829 SOIL MOISTURE - DENSITY TEST REPORT
IN - PLACE TESTS BY NUCLEAR METHODS '
Client Alice Lee c/oRealty Capital Corp. Work Order Number: 00-2518
Project 00-014 Lam Lee Report Number: 00-014.251
SPECIFICATIONS TEST DATA
!Percent Compaction: 90% !Date Tested: 8/29/00
IMoistum ITechnician: iLB
Content(%)
~ MATERIAL REFERENCE CURVE DATA
!Curve Test : MAX DRY OPTIMUM
I No Method, Material Description I DENSITY (pcf)~ MOISTURE
1 D698 Brown Clay .... _~ ..... 103.4/ 18.8;
2 D698 Gray Clay 100.2 19.1
IN-PLACE TEST RESULTS
DENSITY AND MOISTURE TESTS ARE PER ASTM D2922, D3017, RESPECTIVELY
Test Lift or ~ Location Ref Dry Density Moisture. % of Max
No Elevation : Curve~ (pcf) (%) '1 Dry Density
1 1st Lift iSouth detector check vault 2 94.8 19.1 95.0
2 2nd Lift ',South detector check vault 2 91.5 19.8 91.0
3 3rd Lift ~South detector check vault 2 90.6 19.1 90.0
NUCLEAR GUAGE ID: 61611 STD DENSITY COUNT: 2390! STD MOISTURE COUNT: 495
AN 'R' AFTER THE TEST NUMBER INDICATES RETEST.
* INDICATES FAILURE TO COMPLY/I~ITH PROJECT SPECIFICATIONS,
SOILJI'ECH EN~lbi~_.~F_xRI~'I~(~ AND//TESTING, INC.
~Jarr~s M. Perdue (:~eral Manager
2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax