Loading...
Lam Lee Add-LR000829 SOIL MOISTURE - DENSITY TEST REPORT IN - PLACE TESTS BY NUCLEAR METHODS ' Client Alice Lee c/oRealty Capital Corp. Work Order Number: 00-2518 Project 00-014 Lam Lee Report Number: 00-014.251 SPECIFICATIONS TEST DATA !Percent Compaction: 90% !Date Tested: 8/29/00 IMoistum ITechnician: iLB Content(%) ~ MATERIAL REFERENCE CURVE DATA !Curve Test : MAX DRY OPTIMUM I No Method, Material Description I DENSITY (pcf)~ MOISTURE 1 D698 Brown Clay .... _~ ..... 103.4/ 18.8; 2 D698 Gray Clay 100.2 19.1 IN-PLACE TEST RESULTS DENSITY AND MOISTURE TESTS ARE PER ASTM D2922, D3017, RESPECTIVELY Test Lift or ~ Location Ref Dry Density Moisture. % of Max No Elevation : Curve~ (pcf) (%) '1 Dry Density 1 1st Lift iSouth detector check vault 2 94.8 19.1 95.0 2 2nd Lift ',South detector check vault 2 91.5 19.8 91.0 3 3rd Lift ~South detector check vault 2 90.6 19.1 90.0 NUCLEAR GUAGE ID: 61611 STD DENSITY COUNT: 2390! STD MOISTURE COUNT: 495 AN 'R' AFTER THE TEST NUMBER INDICATES RETEST. * INDICATES FAILURE TO COMPLY/I~ITH PROJECT SPECIFICATIONS, SOILJI'ECH EN~lbi~_.~F_xRI~'I~(~ AND//TESTING, INC. ~Jarr~s M. Perdue (:~eral Manager 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax