Loading...
MacPlaza1 Sonic-CS 960604 C'OPPI~T.L ENG/'NEER/NG .q. EWORANDU~ DATE: ~ '-? TO: Mike Martin, E.I.T. FROM: Ted Dutt, Interim Utilities Superintendent. -. i i., i ">-' RE: Fees ~ ~ "..., ~ .,,~ /"'.I.--.,. '~':c The following fees should be assessed and collected on the above referenced project. Water Impact~ Fee: - Domestic Meter/s = I ESU's - I Irrigation Meter/s = ~_. ~.~ESU's - Fireline Meter/s = ESU's Total , ESU's ~ $450.00 ea = $ 100% due prior to Council approval of the final plat. wastewa~' Imp~ ct - ?~/~ DomesticMeter/s= / ESU's .. .~ 7% .~: Total / ESU's ~ $450.00 ea = . --~ ' , 100% due prior to Council approval of the final plat. Water Tap Inspection Fee .~. Connections ~ $50.00 each = $ "' / ' 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee ~ ,' ! Connections ~ $50 O0 each = $-~.. 100% due prior to issuance of building permit. (Residential only) (RE-INSPECTIONS for Water or Wastewater $30.00) Development Fees Page 2 Utility Final Inspection Fee (Ail Development) lots @ $ 50.O0/lot = S ~,J' ' 100% due prior to issuance of building permit. Water Meter Fee (Domestic) - -'"?,.~ Domestic Meters @ d ~/ = $ ~,~ ~-.i 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) - I Irrigation Meter/s - Fireline Meterls @ $ ea = $ otal ..... 100% due prior to issuance of water meter/s. Water Meter Deposit (Multi-Family or Non-Residential) Meters ~ $30.00 ea = S ._.~ 100% due prior to issuance of water meters. Irrigation Meter Deposit Meters @ 535.00 ea = $ 100% due prior to issuance of water meters. Park Fee F'o~those developments having preliminary plat approval prior to June 23, ~2 the following assessment is determined: '~sidential Lots at $150.00 each = S Uni~s~.s~~'~ulti family) at $75.00 each = $ 50% of the amount s~d~i~ed above shall be paid by the Developer; prior to Council approval--~'o~ ~nal plat. 50% remaining shall be paid by the'~Bui.1..der at such time as a building permit is issued. -. Development Fees Page $ For those developments having preliminary plat approval after June 23, 1992 the following assessment is determined: Residential Lots at $350.00 each = $ Units (Multi-Family) at $350.00 each = $ 50% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after October 26, 1993 the following assessment is determined: Residential Lots at $1,285.00 each = $ Units (Multi-Family) at $1,285.00 each = $ 100% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Signs Fee See attached Street Sign Assessment sheet. 100% due prior to final acceptance of project. Development Fees Page 4 STREET SIGN ASSESSMENT for The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE OUANTITY EXTENDED PRICE No Parking 553.10 Speed Limit 563.54 Yield 558.56 Stop 565.12 Street Name Sll.60 stop & Street Combo 596.85 OTHER TOTAL * Cost breakdowns may be obtained from Public Works by written request. DEVFEES.HLP Revised 1/22/96 disk$3 form