Lam Lee Add-LR000817 CONCRETE INSPECTION AND COMPRESSION TEST REPORT
Client: Alice Lee c/oRealty Capital Corp. Work Order Number: 00-2426
Project: 00-014 Lam Lee Report Number: 00-014.248
SPECIFICATIONS PROJECT DATA
Strength (psi): 3000 PSI @ 28 DAYS iDate of Placement: 18117100
Slump(in.): 4"-6" iSampled by: iContractor Made
~Air Content(%): N/A Weather. !Warm/Humid
Concrete Temp(F): Not to exceed 90 degree ISupplier/Mix: iPioneer
FIELD DATA SET # 1
Ticket #: N/A ITime Batched: Time Sampled:
Slump (in.): N/A lair Content: ~ N/A [Unit Weight (pcf): "1 N/A
Concrete Temp(F): N/A I.~ir Temp (F): i N/A !Yardage:~
[Location/Remarks: Light Pole Standards South Side of Parking Lot
, SET CYLINDER DATE ! AGE MAX LOAD STRENGTHi TEST CYLINDER NOTES
NO. NO. !TESTED (days) (lbs) (psi) RESULT SOURCE
1 01 !8/24/00: 7 75000 2650
1 02 ,9/14/00 28 100000 3540
1 03 9/14/00i 28 103000 3640
1 04 '0/12/0 Discard
NORMAL CYLINDER SIZE: 5X12, AREA:28.27sq. in. UNLESS NOTED HERE: TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. TEST RESULTS COMPLY
WITH PROJECT SPECIFICATIONS UNLESS INDICATED "NON-COMPLIANCE" IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER APPLICABLE
ASTM STANDARDS: C138, C143, C172, C231. CYLINDERS MOLDED AND CURED BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER ASTM C31, TESTED PER ASTM
SgLTECH EH__~NEE~G AND TESTING, INC.
~. J/mes M. Perdue
'"'General Manager
2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax