Lam Lee Add-LR000726 SOIL MOISTURE - DENSITY TEST REPORT
IN - PLACE TESTS BY NUCLEAR METHODS '
Client Alice Lee c/oRealty Capital Corporation Work Order Number: 00-2276
Project 00-014 Lam Lee Report Number: 00-014.236
SPECIFICATIONS TEST DATA
IPercent Compaction: : 95% IDate Tested: [7/26/00
! Technician: ',
Moisture Content(%) i IRB
MATERIAL REFERENCE CURVE DATA
Curve[ Test i MAX DRY ~ OPTIMUM
No Method ! Matedal Descd@tion DENSITY (pcf) MOISTURE
]. D698 iMedium Brown Sandy Clay-Lime Treated ........ 9~._3_i ...... 2.__4.7
IN-PLACE TEST RESULTS
DENSITY AND MOISTURE TESTS ARE PER ASTM D2922, D3017, RESPECTIVELY
Test Lift or Location Ref Dry Density Moisture: % of Max
No Elevation Curve ~p.cf)_ ~ (%) D__Q/_Den_s_itT_
]. Final 'South end, west side turn lane ]. 95.6 23..5 ].00.0
2 Final South end, west side turn lane ]. 95.0 22.~. ].00.0
3 Final ~North end, west side turn lane ! 93.8 23.2 99.0
4 ' Final iNorth end, west side turn lane ! 90.2 26.4 cj6.0
NUCLEAR GUAGE ID: , 6161! STD DENSITY COUNT: : 24731 STD MOISTURE COUNT: 474
AN 'R' AFTER THE TEST NUMBER INDICATES RETEST.
* INDICATES FAILURE TO COMPLY WITH PROJECT SPECIFICATIONS.
sOILTECH ENGLNEER~ AND TESTING, IN
~.J~nes M. Perdue 'General Manaser
2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817,595.0708 fax