Loading...
Lam Lee Add-LR000720 (2) CONCRETE INSPECTION AND COMPRESSION TEST REPORT Client Alice Lee c/oRealty Capital Corporation Work Order Number: 00-2236 Project 00-014 Lam Lee Report Numbe 00-014.238 SPECIFICATIONS i PROJECT DATA !Strength (psi): '~ !Date of Placement: [7/20100 ~ISlump(in'): !1~ ~Sampled by: liC°ntract°r .................. ......... Air Content(%): Weather. ,!Sunny iConcrete Temp(F): ' i Supplier/Mix: i, FIELD DATA SET # Ticket #: ~ Time Batched: !Time Sampled: Slump (in.): ! Air Content: IUnit Weight (pof): I I !Yardage: 0 ,Concrete Temp(F): i Air Temp (F): !Planter walls, contractor made cylinders no other information given ;Location/Remarks: i SET CYLINDER DATE ! AGE I MAX LOAD STRENGTH1 TEST CYLINDER NOTES :;NO. NO, TESTED (days) (lbs) (psi) I RESULT SOURCE i ]. 7/27/00~ 7 73000 2580 1 2 !8/17/00! 28 I 3 i8/17/00i 28 I 4 i Hold NORMAL CYLINDER SIZE: 5X12, AREA:28.27~q. in. UNLESS NOTED HERE: TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED "NON-COMPLIANCE" IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER APPLICABLE ASTM STANDARDS: C138. C143, C172, C231. CYLINDERS MOLDED AND CURED BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER ASTM C31, TESTED PER ASTM General Manager 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax