Lam Lee Add-LR000720 (2) CONCRETE INSPECTION AND COMPRESSION TEST REPORT
Client Alice Lee c/oRealty Capital Corporation Work Order Number: 00-2236
Project 00-014 Lam Lee Report Numbe 00-014.238
SPECIFICATIONS i PROJECT DATA
!Strength (psi): '~ !Date of Placement: [7/20100
~ISlump(in'): !1~ ~Sampled by: liC°ntract°r .................. .........
Air Content(%): Weather. ,!Sunny
iConcrete Temp(F): ' i Supplier/Mix: i,
FIELD DATA SET #
Ticket #: ~ Time Batched: !Time Sampled:
Slump (in.): ! Air Content: IUnit Weight (pof):
I I !Yardage: 0
,Concrete Temp(F): i Air Temp (F):
!Planter walls, contractor made cylinders no other information given
;Location/Remarks:
i SET CYLINDER DATE ! AGE I MAX LOAD STRENGTH1 TEST CYLINDER NOTES
:;NO. NO, TESTED (days) (lbs) (psi) I RESULT SOURCE
i ]. 7/27/00~ 7 73000 2580
1 2 !8/17/00! 28
I 3 i8/17/00i 28
I 4 i Hold
NORMAL CYLINDER SIZE: 5X12, AREA:28.27~q. in. UNLESS NOTED HERE: TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. TEST RESULTS COMPLY
WITH PROJECT SPECIFICATIONS UNLESS INDICATED "NON-COMPLIANCE" IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER APPLICABLE
ASTM STANDARDS: C138. C143, C172, C231. CYLINDERS MOLDED AND CURED BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER ASTM C31, TESTED PER ASTM
General Manager
2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax