Loading...
Lam Lee Add-LR000712 CONCRETE INSPECTION AND COMPRESSION TEST REPORT Client Alice Lee c/oRealty Capital Corporation Work Order Number: 00-2173 Project 00-014 Lam Lee Report Numbe 00-014.232 SPECIFICATIONS PROJECT DATA Strength (psi): 3000 Date of Placement: 17/12/00 ISlump(in.): !4 - 6 Sampled by: iContractor made iAir Content(%): i[na Weather. !Sunny/warm iConcrete Temp(F): INot to exceed 100 Supplier/Mix: 1Pioneer i FIELD DATA SET # 1 ITicket #: ; ITime Batched: Time Sampled: ~Slump (in.): il ~Air Content: !Unit Weight (pcf): IConcrete Temp(F): t ,Air Temp (F)' Yardage: rLocation/Remarks: IContractor made cylinders, no location given SET CYLINDER; DATE = AGE MAX LOAD ISTRENGTHi TEST CYLINDER NOTES ' NO. ! NO. i TESTED (days) (lbs) I (psi) RESULT SOURCE , , I 89000 ! ', I f 2 8/9/00 28 I , NORMAL CYUNDER SIZE: 5X12, AREk28.27sq. in. UNLESS NOTED HERE: TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED "NON-COMPLIANCE" IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172. C231. CYLINDERS MOLDED AND CURED BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER ASTM C31, TESTED PER ASTM SOI/f-T,T. ECH EN / /iIER AN I/TESTING, INC. ~es M. Perdue General Manager 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax