Lam Lee Add-LR000706 CONCRETE INSPECTION AND COMPRESSION TEST REPORT
Client Alice Lee c/oRealty Capital Corporation Work Order Number: 00-2137
Project 00-014 Lam Lee Report Numbe 00-014.231
SPECIFICATIONS i PROJECT DATA
Strength (psi): !4000 iDate of Placement: 7/6/00
Slump(in.): ~4 - 6
' Not to rSampled by: !LB
iAir Content(%): na Weather. ISxunnylHumid
Concrete Temp(F): exceed 100 ISupplier/Mix: Pioneer - 9349
FIELD DATA SET # 1
Air Content:
!Ticket #: ! 509733 Time Batched: L 7:02:00 AM ITime Sampled: 8:02:00 AM
iSlump (in.): 5 314 [ na IUniti Weight (pcf): ! na
Concrete Temp(F): I 78 !Air Temp (F): I 88 !Yardage: 20
Location/Remarks: Floor slab leaveout southeast comer
SET CYLINDER DATE I AGE MAX LOAD STRENGTHi TEST CYLINDER NOTES
NO. NO. TESTED (days) (lbs) (psi) RESULT SOURCE
' I ' 1 7/13/00i 7 75000 2650
1 2 8/3/00 28
1 3 1813100' 28 I
1 4 ! I Hold i
NORMAL CYLINDER SIZE: 5X12, AREk28.27sq. in. UNLESS NOTED HERE: TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. TEST RESULTS COMPLY
WiTH PROJECT SPECIFICATIONS UNLESS iNDICATED "NON-COMPLIANCE" IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER APPLICABLE
ASTM STANDARDS: C138, C143, C172. C231. CYt. INDERS MOLDED AND CURED BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER ASTM C31, TESTED PER ASTM
SOILTECH ENGINEERING AND TESTING, INC.
'~neral Manager
2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589,7279 metro · 817.595.0708 fax