MacPlaza Phase 2-CS 970403 DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: MacAnkur Plaza. Phase H. ~ Plat. to allow the de~elapment of a
30,000 square foot retail building on a 4.10 acre site, located on the
west side of MacArthur Blvd., approximately 186.53 feet north of the
DART rail r.o.w., at the request of Nathan D. Maier Consulting
Engineers, Inc.
DRC DATE: Marck 27, 1997 and April 3, 1997
CONTACT: Mike Martin, P.E., Assistant City Engineer 004-3679)
COMMENT STATUS: Pt~LIMINA II Y
Final Plat:
1. Impact fees are required.
Landscape Plan:
2. Please move proposed 5' sidewalk away from the back of the curb.
Site Plan:
3. Please move proposed 5 foot sidewalk away from the back of curb.