MacPlaza Phase 2-CS 970327 DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: MacArthur Plaza, Phase II. lrtnal Plat. to allow the development of a
30, 000 square foot retail building on a 4.10 acre site, located on the
west side of MacAtthur Blvd., approximately 186.53 feet north of the
DART rail r.o.w., at the request of Nathan D. Maier Consulting
Engineers, Inc.
DRC DATE: March 27, 1997 and April 3, 1997
CONTACT: Mike Martin, P.E., Assistant City Engineer 004-3679)
COMMENT STATUS: ,/PRELIMINARY FINAL REVISED
AFTER P&Z
Final Plat:
1. How is the access to the property west of here going to be provided?
2. Show finished floor elevation of development.
3. Show visibility sight triangles at ingress/egress points.
4. Dimension the utility and drainage easement across adjacent properties. Prow~de
easements.
5. Impact fees are required.
Landscape Plan:
6. Please move proposed 5' sidewalk away from the back of the curb.
Site Plan:
7. The proposed driveway to the 1.42 acre future development should be removed. An~
driveway approvals will be discussed when the City sees a site plan for the ! .42 acre ~tu~:
development.