Magnolia Fish-CS010515 FILE
May 15, 2001
William Wingo
1625 North Story Road
Suite 144
Dallas, TX 75061
RE: Magnolia Fisheries
Fee Assessment Letter
Mr Wingo:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with
a copy of the Development Fee calculations for the referenced development.
Please make payment for the Impact Fees to the City of Coppell in the amount of
$1,208.40 and forward to the Engineering Department along with a copy of the Fee
Assessment table. Also provide a copy of the Engineer's estimate or contract to our office
so the 2% & 4% construction inspection fee can be verified.
Appropriate payment of the required fees will help insure a successful beginning of this
project. We look forward to working with you on this project. If you have any questions,
please contact me.
Si,n~erely,!
Assistant City Engineer
cc: Jennifer Armstrong, Finance Director
Rhonda Brothers, Engineering Secretary
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Gary Sims, Director of Leisure Services
2~55 raARKWA¥ ~l' P O BOX 478 ~' COPPELL TX 75019 ~ TEL 97;'/462 0022 'Jr FAX 972/304 3673
DEVELOPMENT FEE TABLE
Project: Magnolia Fisheries
Date: 5/15/01
TOTAL
FEES DUE
Water Impact Fee $0.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $0.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $0.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $0.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $0.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $0.00
(100 % due at Issuance of Water Meter)
Wastewater Impact Fee $0.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $0.00
(100 % due at Issuance of Building Permit)
Park Fee $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $1,208.40
(100% due prior to Council Approval)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project
Construction Inspection Fee Information not Available
TOTAL $1,208.40
ROADWAY IMPACT FEE CALCULATIONS '
PROJECT: Magnolia Fisheries
DATE: 5/15/01
ROAI3WAY IMPACT FF,,F,:
Service Area * 1 I
Category ** Industrial
I
Land Use ** General Light Industrial
Building Area (sf) 3,800
Development Units ** 3.80
Vehicle Miles per Development Unit ** 1.06
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (DeveloPment Units) x I
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $1,208.40
I
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)