Loading...
Magnolia Fish-CS010515 FILE May 15, 2001 William Wingo 1625 North Story Road Suite 144 Dallas, TX 75061 RE: Magnolia Fisheries Fee Assessment Letter Mr Wingo: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment for the Impact Fees to the City of Coppell in the amount of $1,208.40 and forward to the Engineering Department along with a copy of the Fee Assessment table. Also provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Si,n~erely,! Assistant City Engineer cc: Jennifer Armstrong, Finance Director Rhonda Brothers, Engineering Secretary Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services 2~55 raARKWA¥ ~l' P O BOX 478 ~' COPPELL TX 75019 ~ TEL 97;'/462 0022 'Jr FAX 972/304 3673 DEVELOPMENT FEE TABLE Project: Magnolia Fisheries Date: 5/15/01 TOTAL FEES DUE Water Impact Fee $0.00 (100% due prior to Council Approval) Water Tap Inspection Fee $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $0.00 (100 % due at Issuance of Water Meter) Wastewater Impact Fee $0.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $0.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $0.00 (100 % due at Issuance of Building Permit) Park Fee $0.00 (100% due prior to Council Approval) Roadway Impact Fee $1,208.40 (100% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project Street Sign Fee Information not Available (100% due prior to Acceptance of Project Construction Inspection Fee Information not Available TOTAL $1,208.40 ROADWAY IMPACT FEE CALCULATIONS ' PROJECT: Magnolia Fisheries DATE: 5/15/01 ROAI3WAY IMPACT FF,,F,: Service Area * 1 I Category ** Industrial I Land Use ** General Light Industrial Building Area (sf) 3,800 Development Units ** 3.80 Vehicle Miles per Development Unit ** 1.06 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (DeveloPment Units) x I (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $1,208.40 I * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)