Loading...
Magnolia Park-LR 990430FUGRO SOUTH, INC. 28K ;)h (9; COMPRESSIVE STRENGTH OF CONCRETE CLIENT: PROJECT: Eastern Development R®por Magnolia Park, Coppell, Texas Pn ' "SAMPLE DATE: April 22, 1999 ' REMARKS: Cylinders cast by Contractor. Ali information except test data furnished by .~ontractor and assumed to be correct. Technician: David Putman FUGRO SOUTH, INC. Checked By: SMH/rm Distribution: Eastern Development- Presto~n Skaggs City of Coppell - Larry Davis × Site Concrete - Melissa Uselding CONCRETE CYLINDER COMPRESSIVE STRENGTH TI~STS ' ' Standard 6" x 12', 28.27' square inch~ TOTAL COMPRESSIVE R~IRED COMPRESSIVE CYUNDER AGE DATE LOAD STRENGTH ! STRENGTH NUM,I~R ,, (dayl) TESTED, (poundl) (pll) ~PC ~s6 , ?,, 04/29/99~ ,,, 9~000 , ,34?o ~3s00/2~ days MPc , 187 28 05/20/99 Fracture mode Mi (A) unMM omenvM no~ sp.cmc~on,: Mak~ & ASTM C-3~ Te~no AST~ C-~43. Tyr~ c~ I~ I ~ I'~ I--'I .... C,u~ng-. , ...... Memods: ASTM C-39 Fracture: A 145J~JJ 88 ~ ¢ VI .D L.J EPORT Date: Aapr, 30, 1999 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.lM4): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Jerry Clark Spill way deck CONCRETE SUPPUER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (AS'm c-23t): WATER ADDED (gal): SLUMP (in.) (ASlla C.t43): iect No.: 0771-2112 ' Nelson Brothers Vlrgo Lane; Dallas, Tex~ 75229 2) 484.8301; Fax (972) 620-7328 FUGRO SOUTH, INC. 0 virgo Lane; t72) 484-8301; Dallas, Texa~ 75229 Fax (972) 620-7328 REMARKS: Cylinders cast by Contractor. All information except test data furnished b Contractor and assumed to be correct. Technician: Mike Flute FUGRO SOUTH, INC. Checked By: ~"~=~=~, ,,~ SMH/md Distribution: Eastern Development - Preston Skaggs City of Coppell - Larry Davis Site Concrete - Melissa Uselding ' ' coNCRETE cYUNDER'COMPRESSIVE STRENGTH T~STS ' TOTAL COMPRESSIVE I~QUIRED COMPRESSIVE AGE DATE LOAD STRENGTH ! STRENGTH CYLINDER {day.) TESTED (P~.~) (P~) ,~ (P~), ,, MPc 183 7 , 04/29/99 98000,, , 3470 , ~, 3500/28 days . MpC ~S4 2S 0S/20/~9 ,' / , , , Curing-, . , Me~: ASTM, C-39 Fracture: A w31j a ~ ,,q,, Y--I ~, L.J COMPRESSIVE STRENGTH OF CONCRETE :~EPORT CLIENT: Eastern Development Rep~ rt Date: Apr, 30, ~999 PROJECT: Magno,a Park, COPp~I, Texas Pp)ject No.: 0'rrl-21~2 SAMPLE DATE: ,April 21,199g' ' , , CONTRACTOR: Jimmy Clark TICKET NO.: CONCRETE SUPPUER: Nelson Brothers AMBIENT TEMP. (cF): PLANT/TRUCK: CONCRETE TEMP. (cF) (AST~ C.10~4): MIX ID NUMBER: TIME BATCHED: AIR (%) (ASl'~ C.~1): TIME SAMPLED: WATER ADDED (gal): WEATHER CONDITION: SLUMP (in.) (ASTM C.14~) LOCATION OF PLACEMENT: Spill way wings and walls FUGRO SOUTH, INC. 288( Ph (9; CUENT: PROJECT: COMPRESSIVE STRENGTH OF CONCRETE Eastern Development REIN3 Magnolia Park, Coppell, Texas Pr( :SAMPLE DATE: April, 20,'1999 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.10e4): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Jimmy Clark Spillway walls CONCRETE SUPPUER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTII C-2~1): WATER ADDED (gal): SLUMP (in.) (ASTla C.t4a): Virgo Lane; Dall~, Taxa~ 75229 '2) 484-8301; Fax (972) 620.7328 EPORT t Date: Apdl 28, 1999 ,ject No.: 0771-2112. Nelson Brothers FUGRO SOUTH, INC. Checked By: ~ ~ Eastern Development - Preston Skaggs City of Coppell - Larry Davis Site Concrete - Melissa Uselding SMH/rm Distribution: William Putman Technician: REMARKS: Cylinders cast by Contractor. All information except test data furnished by Contractor and assumed to be correct. 'CONCRETE 'CYLINDER CoMPREsSIVE sTRENGTH TlfSTS ..... TOTAL COMPRESSIVE I~:IUIRI~ COMPRESSIVE AGE DATE LOAD STRENGTH / ~TRENGTH CYUNDER , {da~) TESTED (pound~) ,(tm) NUUBER MPC la0 7 , O4/27/99 9S000 , 34OO ~ ~, 3500/28,days / MPC 28 05/ 8 / ,, / MPC t82 28 05/!8/99 , , , I, ~ .... ' ' Fmca~ mo~ ~ (A) ur~ ~ nom~ , Ctmng' Methods' ASTM C-39 Fracture: A ~ B ~ C Y__I O L_I