Loading...
Magnolia Park-LR 981123FUGRO SOUTH, INC. COMPRESSIVE STRENGTH OF CONCRETE CLIENT: PROJECT: Eastem Development Magnolia Park, COppell, Texas Report D; P~ CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): 70 CONCRETE TEMP. (°F) (ASTB C-t0~4): 68 TIME BATCHED: 8:30 am TIME SAMPLED: 8:35 am W~_ATHER CONDITION: Clear/cool LOCATION OF PLACEMENT: Site Concrete CONCRETE SUPPLIER: PLANTffRUCK: MIX ID NUMBER: AIR (%) (~u c.2~t): WATER ADDED (gal): SLUMP (in.) (ASTM Paving: Alley E-2, station 7+50 ~0 vifgo Lane; Da#a~, Texa~ 75229 Ft2) ,la4-8301; F~x (972) 620-7328 REPORT It~: November 23, 1998 oJect No.: 0771-2112 Site Site 4.5 0 31/4 · . ~T~ COMP~SS~ ~QUI~D COMPRESS~ AGE DA~ LO~ S~~ / ~N~ C~NDERNuMBER (da~) ~8~D (pound) ~i) ~ (~i) / MPC 141 7 10/31/98 ~ 2971 ] 3~8 days. MPC 142 28 11~1~8 1080~ 38~ MPC 143 28 11~1~8 1~ 37~ / MPC 1~ Hold J S~~S: MaChO & AS~ ~d~: M~: REMARKS: Technician: Jay Dykstra SMH/rm Distribution: FUGRO SOUTH, INC. Checked By: ~ i Eastern Development- Preston Skaggs City of Coppell - Larry Davis Site Concrete - Melissa Uselding FUGRO SOUTH, INC. COMPRESSIVE STRENGTH OF CONCRETE CLIENT: Eastern Development PROJECT: Magnolia Park, Coppell, Texas Report D; Pr i DATE: OCtOber: . 998: CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): 75 CONCRETE TEMP. (°F) (ASl~ C-lO~4): 70 TIME BATCHED: 3:00 pm TIME SAMPLED: 3:10 pm W~J~THER CONDITION: Clear LOCATION OF PLACEMENT: Paving: Site Concrete CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AiR (%) (AS'r~ C.231): WATER ADDED (gal): SLUMP (in.) (xs11~ c.t4~): Far court area, Madison Street, staff, o v~o Lane; Da~s, Taxa~ 75229 172) 484-8301; Fax (972) 620.7328 REPORT re: November 23, 1998 3ject No.: 0771-2112 Site Site 4.2 0 31~ n 15+33 ' CONCRETE:G~INDER, COMPRES$1vE:s~NGTH: T~EST$ · ::: Sta,nda~6, xi2.,2a~2?squarelnChe': TOT~ ~MP~ ~QUI~ C~P~S8~ C~NDER AGE DA~ LO~ S~N~ / (da~s) ~S~D (pounds) (~i) , , NUMBER (~i) MPC 145 7, 1~31~ 87~0 ~ MPC 1~ 28 11/21~8 1110~ 3926 / MPC 147 28 11/21~8 10~ 3~5 / MPC 1~ Hold j Fm~ ~~s: ~klng & AS~ ~31 T~0ng ~ ~143, T~ , ~dng: Me~: ASTM ~39 F~m: A REMARKS: Technician: Jay Dykstra FUGRO SOUTH, INC. SMH/rm Distribution: Checked By:~"~ I ~ '--- Eastem Development - Preston Skaggs City of Coppell - Larry Davis Site Concrete - Melissa Uselding