Loading...
Latter-day-LR 950215Rone Engineers Geotechnical Consultants Materials Testing neEn ineers GENERAL REPORT Project Church of Jesus Christ of Latter-Day Saints Number ISarnple Date II:,ePorr Date D4251 B-009 02-02-95 0:~-15-95 TO John R. Horton Report of Visual Inspection of Lime Slurry lentification West and Partial North End Method of Test Visual and Applicable Project Specifications Results On the above sample date, Mike Fuller representing Rone Engineers, Inc. performed a visual observation of the lime treatment of the soil for the proposed parking area located on the west side and part of the north side of the building. / The lime slurry was placed and processed using 110,960 pounds of ~lry lime covering a total area of 4,000 square yards. The project requirements of 27.~pounds per square yard was met with the actual quantity of 27.74 pounds per s~quare yards of lime being used. All activities and materials observed were in accordance with project and drawings. John R. Horton/J~)hn R. Horton (1), W.B. Kibler Construction/Sam Ca Fowkes/Bill Fowkes (1), City Coppell/Larry Davis (1) specifications rdwell (1), Bill ~Rone Engtneem Rone Engineers, Inc. Geotechnical Consultants Materials Testing Ro neEngineers · REPORT OF FIELD INSPECTION OF CONCRETE TESTED FOR: JOHN R. HORTON PROJECT: CHURCH OF JESUS CHRIST )F LATTER-DAY SAINTS REPORT DATE: 2/15/95 SAMPLE DATE: 2/2/95 OUR REPORT NO. D4251B-010 FIELD DATA: No of Concrete Water Air Ambient Concrete Set Cylinders Supplier Ticket Time Truck Time Truck Yards of Added Slump Content Temp Temp No Made Number Batched Unloaded Concrete (Gal) (In) (%) °F °F 17 4 327808 10:26 11:30 10 5 1/4 - 65 66 18 4 327886 11:30 1:00 10 5 1/2 79 69 LOCATION: 17 Slab on grade, 2nd - 50' North and 22' East of Southeast Building Corner 18 Slab on grade, 2nd - 27' West and 5' North of Southeast Building Corner TECHNICIAN: Mike Fuller REMARKS: DISTRIBUTION: JOHN R. HORTON/JOHN R. HORTON (1), W.B. KIBLER CONSTRUCTION/SAM C, RDWELL (1), BILL FOWKES/BILL FOWKES {1 ) Rone Engineers, Inc. Rone Engineers Geotechnical Consultants MateriaJs Testing GENERAL REPORT Project Church of Jesus Christ of Latter-Day Saints Number ISample Date D4251 B-O 13 02-03-9~ John R. Horton Report of Visual Inspection of Lime Slurry Identification West Parkin,q Area Method of Test Visual and A0.Dlicable Pro!ect S.Dec. ifi~.atinn.~ Results On the above sample date, Mike Fuller representing Rone Engineers, visual observation of the lime treatment of the soil for the proposed located on the west side of the building pad. The lime slurry was placed and processed covering a total area of 3, The project requirements of 27.5 pounds per square yard was met v quantity of 27.6 pounds per square yards of lime being used. All activities and materials observed were in accordance with projec' and drawings. Mr. Fuller also collected the concrete cylinders cast on 2/2/95. John R. Horton/John R. Horton (1), W.B. Kibler Construction/Sam C~ Fowkes/Bill Fowke~ (1), City of Coppell/Larry Davis (1) :~eport Date 02-15-9s Inc. performed a parking area 932 square yards. /ith the actual specifications rdwell (1), Bill ~,Rone Englneerl Rone Engineers Geotechnical Consultants Materials Testing ineers GENERAL REPORT Project Church of Jesus Christ of Latter-Day Saints Number ISample D4251 B-O 14 Date 02-04-95 John R. Horton Report of Collection of Soil Samples for Testing Identification Lime Treated Soils Method of Test Applicable ASTM Procedures Results On the above sample date, Kevin Tucker representing Rone Engineer the project to collect three samples of the lime treated soil for Optim Density tests. John R. Horton/John R. Horton (1), W.B. Kibler Construction/Sam C Fowkes/Bill Fowkes (1) =leport Date 02-15-95 s, Inc. arrived at um Moisture ~rdwell (1), Bill ~Rone Englneera Rone Engineers Gao=echnical Consultants Ma=erials Testing REPORT PROJECT: Church of Jesus Christ of Latter-Day Saints REPORT NO.: D4251B-015 CLIENT: John R. Horton REPOR' SAMPL REPORT OF LABORATORY TESTS performed under Standard Test Method ASTM D698 fo MOISTURE-DENSITY RELATION OF SOILS Using A 5.5 LB Rammer and 12-Inch Drop METHOD C Source of Material: On Site Material Description: Tan Sandy Clay W/Rock & Lime Laboratory Results Maximum Dry Density, Lbs. per Cubic Foot: 121.5 Optimum Moisture Content, Percent: 11.8 RONE ENGINEERS, INC. SAMPLED ineers DATE: 2/15/95 DATE: 2/4/95 BY: Kevin Tucker Rone Engineers Geo=echnical Consultan=s Ma=erials Tes=ing o, ,e n lneers GENERAL REPORT PROJECT: Church of Jesus Christ of Latter-Day Saints REPORT NO.: D4251B-016 CLIENT: John R. Horton REPOR'~ SAMPL REPORT OF LABORATORY TESTS performed under Standard Test Method ASTM D698 fo MOISTURE-DENSITY RELATION OF SOILS Using A 5.5 LB Rammer and 12-Inch Drop DATE: 2/15/95 DATE: 2/4/95 METHOD A Source of Material: On Site Material Description: Gray Shaley Clay - Lime Treated Laboratory Results Maximum Dry Density, Lbs. per Cubic Foot: 91.3 Optimum Moisture Content, Percent: 22.7 RONE ENGINEERS, INC. SAMPLED BY: Kevin Tucker Rone Engineers Geotechnical Consultants Materials Testing ROi, GENERAL REPORT PROJECT: Church of Jesus Christ of Latter-Day Saints REPORT NO.: D4251B-017 CLIENT: John R. Horton REPOR3 SAMPL REPORT OF LABORATORY TESTS performed under Standard Test Method ASTM D698 fo~ MOISTURE-DENSITY RELATION OF SOILS Using A 5.5 LB Rammer and 12-Inch Drop METHOD A Source of Material: On Site Material Description: Gray Sandy Clay - Lime Treated Laboratory Results Maximum Dry Density, Lbs. per Cubic Foot: 88.3 Optimum Moisture Content, Percent: 27.6 RONE ENGINEERS, INC. SAMPLED ineers DATE: 2/15/95 DATE: 2/4/95 5Y: Kevin Tucker Rone Engineers, Inc. Geotechnical Consultants Materials Testing ,-4:{or eEngineers' REPORT OF FIELD INSPECTION OF CONCRETE TESTED FOR: JOHN R. HORTON PROJECT: CHURCH OF JESUS CHRIST C F LATTER-DAY SAINTS REPORT DATE: 2/15/95 SAMPLE DATE: 2/7/95 OUR REPORT NO. D4251B-018 FIELD DATA: No of Concrete Water Air Ambient Concrete Set Cylinders Supplier Ticket Time Truck Time Truck Yards of Added Slump Content Temp Temp No Made Number Batched Unloaded Concrete (Gal) (In) {%) °F °F 19 4 330305 6:14 7:23 10 10 4 1/4 46 62 20 4 330477 8:30 9:42 110 10 4 1/2 46 61 LOCATION: 19 Slab on grade, West side of Pour #3 - 10' East & 10' North of Southwest Corner 20 Slab on grade, West side of Pour #3 - 30' South & 15' East of Northwest Corner TECHNICIAN: Mike Fuller REMARKS: DISTRIBUTION: JOHN R. HORTQN/JOHN R. HORTON (1), W.B. KIBLER CONSTRUCTION/SAM CA =,DWELL (1), BILL FOWKES/BILL FOWKES (1) Rone Engineers, Inc. i Rone Engineers Geotechnical Consultants Materials Testing neEn ineers GENERAL REPORT Project Church of Jesus Christ of Latter-Day Saints Number [Sample Date D4251 B-021 To John R. Horton 02-07-95 Report of Pulverization Gradation Tests Identification Parking Lot Method of Test THD 260.4 - 72 Results Location Parking Lot 80'W & 10'S of SW Corner of Building Parking Lot 60'S & 35'E of NE Corner of Building ACTUAL % PASSING I 3/4 Sieve eport Date 02-15-9~ , %PASSING #4 Sieve % PASSING #4 Sieve RE( %PASSIN( I 3/4 Sieve 100 71 100 100 63 100 Approach to MacArthur 1 O0 65 100 John R. Horton/John R. Horton (1), W.B. Kibler Construction/Sam Card, Fowkes (1) JIRED 60 60 60 tell (1), Bill Fowkes/Bill lone EngtnNm Rone Engineers, Inc. Geotechnical Consultants Materials Testing Ror eEngineers'. REPORT OF FIELD COMPACTION TESTS TESTED FOR: JOHN R. HORTON PROJECT: CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS REPORT DATE: 2/15/95 SAMPLE DATE: 2/9/95 OUR REPORT NO.: D4251B-022 TEST DATA: / MAXIMUM OPTIMUM IN PLACE IN PLACI~ SOIL ID LAB DRY MOISTURE MOISTURE i DRY ! PERCENT TEST NO DATE DEPTH , NUMBER DENSITY CONTENT CONTENT DENSITYI COMPACTION COMMENT 1 2/9 6" 1 121.5 11.8 13.0 117.0! 96.0 5A 2 i 2/9 61 ! 1 121.5 11.8 12.0 120.5l / 99.0 5A 3 2/9 6 2 88.3 27.6 30.0 i 85.5 / 97.0 5 A 4 2/9 61 2 88.3 27.6 28.0 86.5/ 98.0 5A TEST LOCATION: , , / 1 Parking Lot, 50 South & 30 East of Southeast Corner of Building - Final / 2 I Parking Lot, 125' South & ,60' East of Southeast Corner of Building - Final / 3 i Parking Lot, 30' South & 5 ,East of Southwest Corner of Building - Final / 4 Parking Lot, 40' North & 40, East of Southeast Corner of Building - Final / NOTES:DENSITIES SHOWN: Lbs, per cubic foot 1. FILL MATERIAL A. TEST RESULTS COMPI~Y WITH SPECIFICATIONS MOISTURE CONTENT: Percent of dry weight 2. BACKFILL B, RECOMPACTION REQUIRED PERCENT COMPACTION: Baaed on maximum 3. BASE COURSE C. TEST IS AFTER RECO~PACTION dry density obtained on aample 4, SUBGRADE MATERIALS D, MOISTURE CONTENT ~)UT OF SPECIFICATION indicated by soil ID number. 5. STABILIZED SUBGRADE / I s. OTHER / REMARKS: Soil ID: #1. Tan Sandy Clay W/Rock & Lime #2. Gray Sandy Clay-Lime Treated / / TECHNICIAN: Kevin Tucker / / D,STRISUT~O.: ~O.. R. HO,TONe-,OH. R..ORTO, I1). W.~. K,~LER CO.STRUCT, O,~S^M CAROWEL. (~).~,LL FOWKES/~,LL FOWKES (1) / / · / RONE ENGINEERs, ,NC./~ Rone Engineers Geotechnical Consultants Materials Testing GENERAL REPORT Project Church of Jesus Christ of Latter-Day Saints Number ISample Date D4251 B-023 To John R. Horton 02-09-95 Report of Lime Depth Checks 'Identification Parking Lot Method of Test Visual and Applicable Proiect Soecifications tesults On the above sample date, Kevin Tucker representing Rone Engineer., the project to perform lime depth 'checks on the parking lot. Results are as follows: Location 50' South & 30' East of Southeast Corner of Building 20' South & 40' East of Northeast Corner of Building Actual Depth IF ;eport Date 02-15-95 Inc. arrived at Required Deoth 11 611 John R. Horton/John R. Horton (1), W.B. Kibler Construction/Sam C~ Fowkes/Bill Fowkes (1) rdwell (1), Bill Engineer1 Rone Engineers, Inc. Geotechnical Consultants Materials Testing ^ ineers'.. REPORT OF FIELD INSPECTION OF CONCRETE / TESTED FOR: JOHN R. HORTON PROJECT: CHURCH OF JESUS CHRIST O~ LATTER-DAY SAINTS / REPORT DATE: 2/15/95 / / SAMPLE DATE: 2/10/95 OUR REPORT NO. D4251B-024 / / FIELD DATA: / ' No of Concrete Water ! Air Ambient Concrete Set Cylinders Supplier Ticket Time Truck Time Truck Yards of Added Slump lContent Temp Temp No Made Number Batched Unloaded Concrete (Gal) (In) ! (%) °F °F 1 3 Cubes On-Site ..... ! - 64 60 1 3 Grout On-Site ...... 64 62 LOCATION: ' ' / 1 (Cubes) - 3rd course, 3 blocks East of Southwest corner / I (Grout Cylinders} - 8th block from Southeast corner, 6th course ~TI~ECMHANRIKClsA:N: Kevin Tucker / FOWKES(1) __ Rone Engineers, Inc./ Rone Engineers, Inc. Geotechnical Consultants Materials Testing REPORT OF FIELD COMPACTION TESTS ,- {or{eEngineers'-. TESTED FOR: JOHN R. HORTON PROJECT: CHURCH OF JESUS CHRIST ()F LATFER-DAY SAINTS REPORT DATE: 2/15/95 SAMPLE DATE: 2/10/95 OUR REPORT NO.: D4251B-027 TEST DATA: MAXIMUM OPTIMUM IN PLACE IN PLACE SOIL ID LAB DRY MOISTURE MOISTURE DRY PERCENT TEST NO DATE DEPTH NUMBER DENSITY CONTENT CONTENT DENSITY COMPACTION COMMENT I 2/10 6" 1 88.3 27.6 30.0 87.5 99.0 5 A 2 2/10 6" 2 91.3 22.7 25.0 89.8 98.0 5 A 3 2/10 6" 2 91.3 22.7 24.0 89.3 97.0 5 A 4 2/10 6" 2 91.3 22.7 24.0 90.5 99.0 5 A 5 2/10 6" 2 91.3 22.7 23.0 89.5 98.0 5 A 6 2/10 6" 2 91.3 22.7 24.0 88.3 97.0 5 A TEST LOCATION: 1 25' North & 15' West of Northeast corner of building - Final 2 Approach off MacArthur - Final 3 20' North & 25' East of Northwest corner of building - Final 4 40' South & 60' West of Northwest corner of building - Final 5 75' North & 45' West of Southwest corner of building - Final 6 15' North & 55' West of Southwest corner of building - Final NOTES:DENSITIES SHOWN: Lbs. per cubic foot 1. FILL MATERIAL A. TEST RESULTS COMPL~ WITH SPECIFICATIONS MOISTURE CONTENT: Percent of dry weight 2. BACKFILL B. RECOMPACTION REQUIF;ED PERCENT COMPACTION: Based on maximum 3. BASE COURSE C. TEST IS AFTER RECOMI= ACTION d~y density obtained on sample 4. SUBGRADE MATERIALS D. MOISTURE CONTENT Ot IT OF SPECIFICATION indicated by soil ID number. 5. STABILIZED SUBGRADE 6. OTHER REMARKS: Soil ID: //1. Gray Sandy Clay W/Lime #2. Gray Shaley Clay W/Lime :TECHNICIAN: Kevin Tucker DISTRIBUTION: JOHN R. HORTON/JOHN R. HORTON (1), W.B. KIBLER CONSTRUCTION/SAM CARDWELL (1), BII.L FOWKES/BILL FOWKES (1) .RONE ENGINEERS, INC. ~ Rone Engineers Geotechnical Consultants Materials Testing R neEnjineers GENERAL REPORT Project Church of Jesus Christ of Latter-Day Saints Number D4251 B-028 ISample John R. Horton Report of Lime Depth Checks Identification Date 02-10-95 Method of Test Visual and ADr~licable Pro!ect S_~eeifie. atinn.q Results On the above sample date, Kevin Tucker representing Rone Engineer the project to perform lime depth checks. Results are as follows: Location Actual Deoth Required Deb Approach off MacArthur 15' North & 55' West of Southwest Corner of Building 7 1/2" 6" leport Date 02-15-95 ;, Inc. arrived at 8 1/2" 6" John R. Horton/John R. Herren (1), W.B. Kibler Construction/Sam Fowkes/Bill Fowkes (1) :h ~rdwell (1), Bill JoneEngtneell I Rone Engineers GeotechnicaJ Consultants Materials Testing GENERAL REPORT Project Church of Jesus Christ of Latter-Day Saints I Sample Date D4251 B-008 3neEn ineers 02-01-95 Number John R. Horton Report of Visual Inspection of Lime Slurry Placement Identification South Parking Area Method of Test Visual and Applicable Proiect Specifications Results On the above sample date, Jeff Vanblaricom representing Rone Engir performed a visual observation of the lime treatment of the soil Iocat end of the building pad for the proposed parking area. The following tickets were delivered and dispersed at the above Ioca 23528, 23529, 23530, 23531, 23532, 23533 and 6064. The lime and processed to a depth of approximately six inches using 169,059 lime covering a total area of 6,023 square yards. The project require pounds per square yard was met with the actual quantity of 28.1 po yards of lime being used. All activities and materials observed were in accordance with project and drawings. John R. Horton/John R. Horton (1), W.B. Kibler Construction/Sam C~ Fowkes/Bill Fowkes (1), City of Coppell/Larry Davis (1) [eport Date 02-15-95 leers, Inc. ~d on the south tion: 23527, slurry was placed pounds of dry ments of 27.5 unds per square specifications ~rdwell (1), Bill