GENERAL REPORT
Project
Church of Jesus Christ of Latter-Day Saints
Number ISarnple Date II:,ePorr Date
D4251 B-009 02-02-95 0:~-15-95
TO
John R. Horton
Report of
Visual Inspection of Lime Slurry
lentification
West and Partial North End
Method of Test
Visual and Applicable Project Specifications
Results
On the above sample date, Mike Fuller representing Rone Engineers, Inc. performed a
visual observation of the lime treatment of the soil for the proposed parking area
located on the west side and part of the north side of the building.
/
The lime slurry was placed and processed using 110,960 pounds of ~lry lime covering
a total area of 4,000 square yards. The project requirements of 27.~pounds per
square yard was met with the actual quantity of 27.74 pounds per s~quare yards of
lime being used.
All activities and materials observed were in accordance with project
and drawings.
John R. Horton/J~)hn R. Horton (1), W.B. Kibler Construction/Sam Ca
Fowkes/Bill Fowkes (1), City Coppell/Larry Davis (1)
specifications
rdwell (1), Bill
~Rone Engtneem
Rone Engineers, Inc.
Geotechnical Consultants
Materials Testing
Ro neEngineers ·
REPORT OF FIELD INSPECTION OF CONCRETE
TESTED FOR: JOHN R. HORTON PROJECT: CHURCH OF JESUS CHRIST )F LATTER-DAY SAINTS
REPORT DATE: 2/15/95
SAMPLE DATE: 2/2/95 OUR REPORT NO. D4251B-010
FIELD DATA:
No of Concrete Water Air Ambient Concrete
Set Cylinders Supplier Ticket Time Truck Time Truck Yards of Added Slump Content Temp Temp
No Made Number Batched Unloaded Concrete (Gal) (In) (%) °F °F
17 4 327808 10:26 11:30 10 5 1/4 - 65 66
18 4 327886 11:30 1:00 10 5 1/2 79 69
LOCATION:
17 Slab on grade, 2nd - 50' North and 22' East of Southeast Building Corner
18 Slab on grade, 2nd - 27' West and 5' North of Southeast Building Corner
TECHNICIAN: Mike Fuller
REMARKS:
DISTRIBUTION: JOHN R. HORTON/JOHN R. HORTON (1), W.B. KIBLER CONSTRUCTION/SAM C, RDWELL (1), BILL FOWKES/BILL
FOWKES {1 )
Rone Engineers, Inc.
Rone Engineers
Geotechnical Consultants
MateriaJs Testing
GENERAL REPORT
Project
Church of Jesus Christ of Latter-Day Saints
Number ISample Date
D4251 B-O 13 02-03-9~
John R. Horton
Report of
Visual Inspection of Lime Slurry
Identification
West Parkin,q Area
Method of Test
Visual and A0.Dlicable Pro!ect S.Dec. ifi~.atinn.~
Results
On the above sample date, Mike Fuller representing Rone Engineers,
visual observation of the lime treatment of the soil for the proposed
located on the west side of the building pad.
The lime slurry was placed and processed covering a total area of 3,
The project requirements of 27.5 pounds per square yard was met v
quantity of 27.6 pounds per square yards of lime being used.
All activities and materials observed were in accordance with projec'
and drawings.
Mr. Fuller also collected the concrete cylinders cast on 2/2/95.
John R. Horton/John R. Horton (1), W.B. Kibler Construction/Sam C~
Fowkes/Bill Fowke~ (1), City of Coppell/Larry Davis (1)
:~eport Date
02-15-9s
Inc. performed a
parking area
932 square yards.
/ith the actual
specifications
rdwell (1), Bill
~,Rone Englneerl
Rone Engineers
Geotechnical Consultants
Materials Testing
ineers
GENERAL REPORT
Project
Church of Jesus Christ of Latter-Day Saints
Number ISample
D4251 B-O 14
Date
02-04-95
John R. Horton
Report of
Collection of Soil Samples for Testing
Identification
Lime Treated Soils
Method of Test
Applicable ASTM Procedures
Results
On the above sample date, Kevin Tucker representing Rone Engineer
the project to collect three samples of the lime treated soil for Optim
Density tests.
John R. Horton/John R. Horton (1), W.B. Kibler Construction/Sam C
Fowkes/Bill Fowkes (1)
=leport Date
02-15-95
s, Inc. arrived at
um Moisture
~rdwell (1), Bill
~Rone Englneera
Rone Engineers
Gao=echnical Consultants
Ma=erials Testing
REPORT
PROJECT: Church of Jesus Christ of Latter-Day Saints
REPORT NO.: D4251B-015
CLIENT: John R. Horton
REPOR'
SAMPL
REPORT OF LABORATORY TESTS
performed under Standard Test Method ASTM D698 fo
MOISTURE-DENSITY RELATION OF SOILS
Using A 5.5 LB Rammer and 12-Inch Drop
METHOD C
Source of Material: On Site
Material Description: Tan Sandy Clay W/Rock & Lime
Laboratory Results
Maximum Dry Density, Lbs. per Cubic Foot: 121.5
Optimum Moisture Content, Percent: 11.8
RONE ENGINEERS, INC.
SAMPLED
ineers
DATE: 2/15/95
DATE: 2/4/95
BY: Kevin Tucker
Rone Engineers
Geo=echnical Consultan=s
Ma=erials Tes=ing
o, ,e n lneers
GENERAL REPORT
PROJECT: Church of Jesus Christ of Latter-Day Saints
REPORT NO.: D4251B-016
CLIENT: John R. Horton
REPOR'~
SAMPL
REPORT OF LABORATORY TESTS
performed under Standard Test Method ASTM D698 fo
MOISTURE-DENSITY RELATION OF SOILS
Using A 5.5 LB Rammer and 12-Inch Drop
DATE: 2/15/95
DATE: 2/4/95
METHOD A
Source of Material: On Site
Material Description: Gray Shaley Clay - Lime Treated
Laboratory Results
Maximum Dry Density, Lbs. per Cubic Foot: 91.3
Optimum Moisture Content, Percent: 22.7
RONE ENGINEERS, INC.
SAMPLED
BY: Kevin Tucker
Rone Engineers
Geotechnical Consultants
Materials Testing
ROi,
GENERAL REPORT
PROJECT: Church of Jesus Christ of Latter-Day Saints
REPORT NO.: D4251B-017
CLIENT: John R. Horton
REPOR3
SAMPL
REPORT OF LABORATORY TESTS
performed under Standard Test Method ASTM D698 fo~
MOISTURE-DENSITY RELATION OF SOILS
Using A 5.5 LB Rammer and 12-Inch Drop
METHOD A
Source of Material: On Site
Material Description: Gray Sandy Clay - Lime Treated
Laboratory Results
Maximum Dry Density, Lbs. per Cubic Foot: 88.3
Optimum Moisture Content, Percent: 27.6
RONE ENGINEERS, INC.
SAMPLED
ineers
DATE: 2/15/95
DATE: 2/4/95
5Y: Kevin Tucker
Rone Engineers, Inc.
Geotechnical Consultants
Materials Testing
,-4:{or eEngineers'
REPORT OF FIELD INSPECTION OF CONCRETE
TESTED FOR: JOHN R. HORTON PROJECT: CHURCH OF JESUS CHRIST C F LATTER-DAY SAINTS
REPORT DATE: 2/15/95
SAMPLE DATE: 2/7/95 OUR REPORT NO. D4251B-018
FIELD DATA:
No of Concrete Water Air Ambient Concrete
Set Cylinders Supplier Ticket Time Truck Time Truck Yards of Added Slump Content Temp Temp
No Made Number Batched Unloaded Concrete (Gal) (In) {%) °F °F
19 4 330305 6:14 7:23 10 10 4 1/4 46 62
20 4 330477 8:30 9:42 110 10 4 1/2 46 61
LOCATION:
19 Slab on grade, West side of Pour #3 - 10' East & 10' North of Southwest Corner
20 Slab on grade, West side of Pour #3 - 30' South & 15' East of Northwest Corner
TECHNICIAN: Mike Fuller
REMARKS:
DISTRIBUTION: JOHN R. HORTQN/JOHN R. HORTON (1), W.B. KIBLER CONSTRUCTION/SAM CA =,DWELL (1), BILL FOWKES/BILL
FOWKES (1)
Rone Engineers, Inc. i
Rone Engineers
Geotechnical Consultants
Materials Testing
neEn ineers
GENERAL REPORT
Project
Church of Jesus Christ of Latter-Day Saints
Number [Sample Date
D4251 B-021
To
John R. Horton
02-07-95
Report of
Pulverization Gradation Tests
Identification
Parking Lot
Method of Test
THD 260.4 - 72
Results
Location
Parking Lot
80'W & 10'S
of SW Corner
of Building
Parking Lot
60'S & 35'E
of NE Corner
of Building
ACTUAL
% PASSING
I 3/4 Sieve
eport Date
02-15-9~ ,
%PASSING
#4 Sieve
% PASSING
#4 Sieve
RE(
%PASSIN(
I 3/4 Sieve
100 71 100
100 63 100
Approach to
MacArthur 1 O0 65 100
John R. Horton/John R. Horton (1), W.B. Kibler Construction/Sam Card,
Fowkes (1)
JIRED
60
60
60
tell (1), Bill Fowkes/Bill
lone EngtnNm
Rone Engineers, Inc.
Geotechnical Consultants
Materials Testing
Ror eEngineers'.
REPORT OF FIELD COMPACTION TESTS
TESTED FOR: JOHN R. HORTON PROJECT: CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
REPORT DATE: 2/15/95
SAMPLE DATE: 2/9/95 OUR REPORT NO.: D4251B-022
TEST DATA: /
MAXIMUM OPTIMUM IN PLACE IN PLACI~
SOIL ID LAB DRY MOISTURE MOISTURE i DRY ! PERCENT
TEST NO DATE DEPTH , NUMBER DENSITY CONTENT CONTENT DENSITYI COMPACTION COMMENT
1 2/9 6" 1 121.5 11.8 13.0 117.0! 96.0 5A
2 i 2/9 61 ! 1 121.5 11.8 12.0 120.5l / 99.0 5A
3 2/9 6 2 88.3 27.6 30.0 i 85.5 / 97.0 5 A
4 2/9 61 2 88.3 27.6 28.0 86.5/ 98.0 5A
TEST LOCATION: , , /
1 Parking Lot, 50 South & 30 East of Southeast Corner of Building - Final /
2 I Parking Lot, 125' South & ,60' East of Southeast Corner of Building - Final /
3 i Parking Lot, 30' South & 5 ,East of Southwest Corner of Building - Final /
4 Parking Lot, 40' North & 40, East of Southeast Corner of Building - Final /
NOTES:DENSITIES SHOWN: Lbs, per cubic foot 1. FILL MATERIAL A. TEST RESULTS COMPI~Y WITH SPECIFICATIONS
MOISTURE CONTENT: Percent of dry weight 2. BACKFILL B, RECOMPACTION REQUIRED
PERCENT COMPACTION: Baaed on maximum 3. BASE COURSE C. TEST IS AFTER RECO~PACTION
dry density obtained on aample 4, SUBGRADE MATERIALS D, MOISTURE CONTENT ~)UT OF SPECIFICATION
indicated by soil ID number. 5. STABILIZED SUBGRADE /
I s. OTHER /
REMARKS: Soil ID: #1. Tan Sandy Clay W/Rock & Lime #2. Gray Sandy Clay-Lime Treated /
/
TECHNICIAN: Kevin Tucker /
/
D,STRISUT~O.: ~O.. R. HO,TONe-,OH. R..ORTO, I1). W.~. K,~LER CO.STRUCT, O,~S^M CAROWEL. (~).~,LL FOWKES/~,LL FOWKES (1)
/
/
· / RONE ENGINEERs, ,NC./~
Rone Engineers
Geotechnical Consultants
Materials Testing
GENERAL REPORT
Project
Church of Jesus Christ of Latter-Day Saints
Number ISample Date
D4251 B-023
To
John R. Horton
02-09-95
Report of
Lime Depth Checks
'Identification
Parking Lot
Method of Test
Visual and Applicable Proiect Soecifications
tesults
On the above sample date, Kevin Tucker representing Rone Engineer.,
the project to perform lime depth 'checks on the parking lot.
Results are as follows:
Location
50' South & 30' East of
Southeast Corner of
Building
20' South & 40' East of
Northeast Corner of
Building
Actual Depth
IF ;eport Date
02-15-95
Inc. arrived at
Required Deoth
11 611
John R. Horton/John R. Horton (1), W.B. Kibler Construction/Sam C~
Fowkes/Bill Fowkes (1)
rdwell (1), Bill
Engineer1
Rone Engineers, Inc.
Geotechnical Consultants
Materials Testing
^ ineers'..
REPORT OF FIELD INSPECTION OF CONCRETE
/
TESTED FOR: JOHN R. HORTON PROJECT: CHURCH OF JESUS CHRIST O~ LATTER-DAY SAINTS
/
REPORT DATE: 2/15/95 /
/
SAMPLE DATE: 2/10/95 OUR REPORT NO. D4251B-024 /
/
FIELD DATA: / '
No of Concrete Water ! Air Ambient Concrete
Set Cylinders Supplier Ticket Time Truck Time Truck Yards of Added Slump lContent Temp Temp
No Made Number Batched Unloaded Concrete (Gal) (In) ! (%) °F °F
1 3 Cubes On-Site ..... ! - 64 60
1 3 Grout On-Site ...... 64 62
LOCATION: ' '
/
1 (Cubes) - 3rd course, 3 blocks East of Southwest corner /
I (Grout Cylinders} - 8th block from Southeast corner, 6th course
~TI~ECMHANRIKClsA:N: Kevin Tucker /
FOWKES(1)
__
Rone Engineers, Inc./
Rone Engineers, Inc.
Geotechnical Consultants
Materials Testing
REPORT OF FIELD COMPACTION TESTS
,- {or{eEngineers'-.
TESTED FOR: JOHN R. HORTON PROJECT: CHURCH OF JESUS CHRIST ()F LATFER-DAY SAINTS
REPORT DATE: 2/15/95
SAMPLE DATE: 2/10/95 OUR REPORT NO.: D4251B-027
TEST DATA:
MAXIMUM OPTIMUM IN PLACE IN PLACE
SOIL ID LAB DRY MOISTURE MOISTURE DRY PERCENT
TEST NO DATE DEPTH NUMBER DENSITY CONTENT CONTENT DENSITY COMPACTION COMMENT
I 2/10 6" 1 88.3 27.6 30.0 87.5 99.0 5 A
2 2/10 6" 2 91.3 22.7 25.0 89.8 98.0 5 A
3 2/10 6" 2 91.3 22.7 24.0 89.3 97.0 5 A
4 2/10 6" 2 91.3 22.7 24.0 90.5 99.0 5 A
5 2/10 6" 2 91.3 22.7 23.0 89.5 98.0 5 A
6 2/10 6" 2 91.3 22.7 24.0 88.3 97.0 5 A
TEST LOCATION:
1 25' North & 15' West of Northeast corner of building - Final
2 Approach off MacArthur - Final
3 20' North & 25' East of Northwest corner of building - Final
4 40' South & 60' West of Northwest corner of building - Final
5 75' North & 45' West of Southwest corner of building - Final
6 15' North & 55' West of Southwest corner of building - Final
NOTES:DENSITIES SHOWN: Lbs. per cubic foot 1. FILL MATERIAL A. TEST RESULTS COMPL~ WITH SPECIFICATIONS
MOISTURE CONTENT: Percent of dry weight 2. BACKFILL B. RECOMPACTION REQUIF;ED
PERCENT COMPACTION: Based on maximum 3. BASE COURSE C. TEST IS AFTER RECOMI= ACTION
d~y density obtained on sample 4. SUBGRADE MATERIALS D. MOISTURE CONTENT Ot IT OF SPECIFICATION
indicated by soil ID number. 5. STABILIZED SUBGRADE
6. OTHER
REMARKS: Soil ID: //1. Gray Sandy Clay W/Lime #2. Gray Shaley Clay W/Lime
:TECHNICIAN: Kevin Tucker
DISTRIBUTION: JOHN R. HORTON/JOHN R. HORTON (1), W.B. KIBLER CONSTRUCTION/SAM CARDWELL (1), BII.L FOWKES/BILL FOWKES (1)
.RONE ENGINEERS, INC. ~
Rone Engineers
Geotechnical Consultants
Materials Testing
R neEnjineers
GENERAL REPORT
Project
Church of Jesus Christ of Latter-Day Saints
Number
D4251 B-028
ISample
John R. Horton
Report of
Lime Depth Checks
Identification
Date
02-10-95
Method of Test
Visual and ADr~licable Pro!ect S_~eeifie. atinn.q
Results
On the above sample date, Kevin Tucker representing Rone Engineer
the project to perform lime depth checks.
Results are as follows:
Location Actual Deoth Required Deb
Approach off MacArthur
15' North & 55' West of
Southwest Corner of
Building
7 1/2" 6"
leport Date
02-15-95
;, Inc. arrived at
8 1/2" 6"
John R. Horton/John R. Herren (1), W.B. Kibler Construction/Sam
Fowkes/Bill Fowkes (1)
:h
~rdwell (1), Bill
JoneEngtneell I
Rone Engineers
GeotechnicaJ Consultants
Materials Testing
GENERAL REPORT
Project
Church of Jesus Christ of Latter-Day Saints
I Sample Date
D4251 B-008
3neEn ineers
02-01-95
Number
John R. Horton
Report of
Visual Inspection of Lime Slurry Placement
Identification
South Parking Area
Method of Test
Visual and Applicable Proiect Specifications
Results
On the above sample date, Jeff Vanblaricom representing Rone Engir
performed a visual observation of the lime treatment of the soil Iocat
end of the building pad for the proposed parking area.
The following tickets were delivered and dispersed at the above Ioca
23528, 23529, 23530, 23531, 23532, 23533 and 6064. The lime
and processed to a depth of approximately six inches using 169,059
lime covering a total area of 6,023 square yards. The project require
pounds per square yard was met with the actual quantity of 28.1 po
yards of lime being used.
All activities and materials observed were in accordance with project
and drawings.
John R. Horton/John R. Horton (1), W.B. Kibler Construction/Sam C~
Fowkes/Bill Fowkes (1), City of Coppell/Larry Davis (1)
[eport Date
02-15-95
leers, Inc.
~d on the south
tion: 23527,
slurry was placed
pounds of dry
ments of 27.5
unds per square
specifications