Latter-day-LR 950221Rone Engineers
Geotechnical Consultants
Materials Testing
Concrete Cyiinder Test Report
Project
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
· : IDate ot Observa:tion IRe
D4251B-026 02-10-95
JOHN R. HORTON
Loca~on
8TH BLOCK FROM SOUTHEAST CORNER - 6 ROWS HIGH
W.B. KIBLER CONSTRUCTION
ON SITE
Vllx Number iMix Description
Weather Conditions
CLEAR
Sampled J Water Added
9:18 AM
Physical Data
FILLER GROUT
Amt:~ent Temperature CF)
64
IPurchase Order
~ort Date
02--21--95
'icket
Temperature (°F)
52
-ACTUAL SPE(;IF1CATIONS
GROUT CYLINDERS
Concrete Cylinder Test(s)
"' SPE(::IFICATIONS
Specimen 1 Age
No. (Days)
ACTUAL
Tot LoadObs.) Ic°mpressive Stmng~
I
12000 1700
3 x 6 Cyl,.
7.06 A~a
{Enginea-/Technician KEVIN TUCKER
Test Dam
l
lA 7 02/17/95
lB 28 03/10/95
lc 28 03/10/95
Curing Method Feat Me~
I
{A~--r~l C 39 r
~ and/or Dism'bulJon
DISTRIBUTION:
JOHN R. HORTON/JOHN R. HORTON (1),
CONSTRUCTION/SAM CARDWELL (1), BILL FOWKES/BILL FOW~
moth Required
3000
~Rone Engineers
W. B.. KIBLER
:ES (~)