Latter-day-LR 950227 (2)Rune Engineers
Geotechnical Consultants
Materials Testing
Concrete Cylinder Test Report
Proiect
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
jDate of Observation
Number
D4-251B-01-29247 IJA/~. 27, ~995
JOHN HORTON ARCHITECT
Locaton
GYM SLAB, 15' S. X 5' E OF NORTHWEST CORNER OF GYM
,~Ta-actor
W. B. KIBLER CONSTRUCTION
Supplier IPlant Truck
TX/ t41 382
JAmbient Temperature (°F) IC, o~,c~,
RoneEn ineers
57 7 02/03/95 103000 3640
58 28 02/24/95 139000 4920
59 28 02/24/95 135000 4780
60 HOLD HOLD
(Days) Test Date
SLUMP (in.)'
3 1/2
Concrete Cylinder Test(s)
· ' SPI-'CIFICAT1ONS
I
ACTUAL
Tot Load ! Comprm~ive Stmngffi
Cs.) (m'~
2uring Mat~od Feat Method Standard ~' x lZ' IEngineer/'rec~nician
ASTMC3~ IASTMC3S Area2e.Z';s~.in. j KEVIN TUCKER
:~marks nd/or D~st~'buti~
JOHN R. HORTON/JOHN R. HORTON (1), W. B. KIBLER CO:
SAM CARDWELL (1), BILL FOWKES/BILL FOWKES (1), CIT
LARRY DAVIS (I)
Time Sampled I Water Added
12:05 PM I 10.0 GALS
Physical Data
· ACTUAL " SP =_ClFiCATIONS
~po~ Date
FEB. 27 .. ~995
ITicket
324830
Temperature (°F)
68
Si~g~ Required
3000
'STRUCTION/
{ OF COPPELL/
Rune Engineers
CLEAR
Mb: Number IMix Descripton
I
45
Weather Conditions
JPurchase Order