Latter-day-LR 950227Rone Engineers
Geotechnical Consultants
Materials Testing
Concrete Cylinder Test Report
Project
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
Number ': Date of Observation IF
D4-251B-01-29247-A JAN. 27, 1995
JOHN HORTON ARCHITECT
GYM SLAB, 25' W. X 15' S. OF NORTRRAST CORNER OF SL
W. B. KIBLER CONSTRUCTION ·
I Truck
P~lm~ 467
Supplier
TXI
Mix Number
45
Mix Descripton
W'eather Conditions
CLEAR
Ambient Temperature ("F) jcoc, c~e
67
Time Sampled t Water Added
1:04 PM I 15.0 GALS
Physical Data
· ACTUAL SPE
SLUMP (in.) 4 3/4
Concrete Cylinder Test(s)
Specimen Age I ! Tm ~ed
(D~s) (lbs.)
No. i Test DaM
61 7 02/03/95 104000
62 28 02/24/95 135000
63 28 02/24/95 133000
64 HOLD HOLD
3680
4780
4700
SPE
RoneEn, ,ineers
:~.arks ~d/~ Disth~on
~Om,T R. HORTOH/~Om,~ R. HORTO~ (1), ~. B. KZBLER CO~
SAM CARDWELL (1), BILL FOWKES/BILL FOWKES (1), CIT'
LARRY DAVIS
%B
Cudng Method Feat Method IStandard 6' x 12" IEngineer/Technician
ASTM C 3~ IASTM C as lama Ze.27 sq. in. I KEVIN TUCKER "
I'l'icket
324878
;~. Teml:~ra~re (°,~
70
[ClFICATiONS
:ClFICATIONS
3000
~STRUCTION/
OF COPPELL/
Rone E~gtneers
IPurchase Order
eport Date
~EB. 27, 1995