Latter-day-LR 950227 (3)Rone Engineers
Geotechnical Consultants
Materials Testing
RoneEn
Concrete Cylinder Test Report
Project IPurchase Orcler
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
eport Date
FEB. 27, 1995
l Date of Observation IF
FEB. 16r 1995
D4-251B-01-29385
ineers
85 7 02/23/95
86 28 03/16/95
87 28 03/16/95
88 HOLD HOLD
Age
(Days)
Physical Data
· ACTUAL '- SPE;CIFICATIONS
SLUMP (in.) 4
Concrete Cylinder Test(s)
" ACTUAL SPECIFICATIONS
Test Date
Tot Load I Compressive ~
tr~.) (pe,')
129500 4580
Curing Method ITest Meff~3d lStandard 6' x 12'
AS'TM C 31 IASTNI C 39 IArea 2e.27 sq. in.
Engineer/Technician
TIM DUKE
Rermui~ md/or Distn%~on
JOHN R. HORTON/JOHN R. HORTON (1), W. S. KIBLER CO]
SAM CARDWELL (1), BILL FOWKES/BILL FOWKES (1), CIT'
LARRY DAVIS (1)
IWater Added 3.0 GALS
e Temperas-ute (°F)
50
,trengl~ Required
~STRUCTION/
OF COPPELL/
Rone Engineers
3000
Ambient Temperature 38
Supplier
TXI
Mix Number IMix Description
45
Weather Conclil~ons
PARTLY CLOUDY
To
JOHN HORTON ARCHITECT
Loca~on
SLAB ON GRADE - 5' W. X 15' N. OFF FAR SOUTHEAST CO:.~/~ER OF CHOIR LOFT
W. B. KIBT.RR CONSTRUCTION .
~ 334812