Loading...
Latter-day-LR 950227 (3)Rone Engineers Geotechnical Consultants Materials Testing RoneEn Concrete Cylinder Test Report Project IPurchase Orcler CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS eport Date FEB. 27, 1995 l Date of Observation IF FEB. 16r 1995 D4-251B-01-29385 ineers 85 7 02/23/95 86 28 03/16/95 87 28 03/16/95 88 HOLD HOLD Age (Days) Physical Data · ACTUAL '- SPE;CIFICATIONS SLUMP (in.) 4 Concrete Cylinder Test(s) " ACTUAL SPECIFICATIONS Test Date Tot Load I Compressive ~ tr~.) (pe,') 129500 4580 Curing Method ITest Meff~3d lStandard 6' x 12' AS'TM C 31 IASTNI C 39 IArea 2e.27 sq. in. Engineer/Technician TIM DUKE Rermui~ md/or Distn%~on JOHN R. HORTON/JOHN R. HORTON (1), W. S. KIBLER CO] SAM CARDWELL (1), BILL FOWKES/BILL FOWKES (1), CIT' LARRY DAVIS (1) IWater Added 3.0 GALS e Temperas-ute (°F) 50 ,trengl~ Required ~STRUCTION/ OF COPPELL/ Rone Engineers 3000 Ambient Temperature 38 Supplier TXI Mix Number IMix Description 45 Weather Conclil~ons PARTLY CLOUDY To JOHN HORTON ARCHITECT Loca~on SLAB ON GRADE - 5' W. X 15' N. OFF FAR SOUTHEAST CO:.~/~ER OF CHOIR LOFT W. B. KIBT.RR CONSTRUCTION . ~ 334812