Loading...
Latter-day-LR 950301 (7)Rone Engineers Geotechnicai Consultants Materials Testing Concrete Cylinder Test Report Pmject CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Numbe~ -: JDate of Obsafva~on D4-251B-01-29424-A I FEB. 21, 1995 RoneEn iineers IPurchase Order ~e~x~ Date MARCH 1995 To JOHN R. HORTON, ARCHITECT Loca~on PAVING - 70'N. X 50' E. OF SOUTHWEST CORNER W. B. KIBLER CONSTRUCTION· Supplier Wix Number IMix Description 8273 I IWater Added 15.0 GALS I Ambient Temperature CF) 75 Weather Conditions CLEAR Time Sampled 12:30 PM Physical Data · ACTUAL " SLUMP (in.) 5 AIR ENTRAINMENT (%) 5.1 Concrete Cylinder Test(s) ACTUAL Test Date Specimen I Age No. J (Da~) 105000 3710 93 7 02/28/95 94 28 03/21/95 95 28 03/21/95 96 HOLD HOLD Curing Me~od estlT~ ~ethod IStendard 6' x ~' IEnginear/'recnnician ~ C 3~~ASTM C ~ ~ ~.m7,~. ~ I KEVIN TUCKER JOHN R. HORTON/JOHN R. HORTON (1), W. B. ·KIBLER C( SAM CARDWELL (1), BILL FOWKES/BILL FOWKES (1), Cid LARRY DAVIS (1-) IT~:ket 338236 J Cor~cr ~te Temperature (.'F) 73 SPECIFICATIONS SPJ--ClFiCATIONS mreng~ Req,~red 4000 INSTRUCTION/ ~Y OF COPPELL/ Rone Engineers