Latter-day-LR 950301 (3)Rone Engineers
Geotechnical Consultants
Materials Testing
Concrete Cylinder Test Report
Project
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
lNumber " Jl:)ateofObse~on
D4-251B-01-29424-C I FEB. 21, 1995
JOHN R. HORTON, ARCHITECT
PAVING - 100' W. X 75' N. OF SOUTHEAST CORNER
W. B. KIBLER CONSTRUCTION.
~lix Number jMix Description
8273
Weather Conditions
CLF3LR
jAmbient Temperature CF)
33me Sampled t Water Added
3~53 PM I 15.0 GALS
Physical Data
· ACTUAL "
SLUMP (in..)
AIR ENTRAINMENT (%)
Concrete Cylinder Test(s)
4
4.8
No. I (Days)
101 7
102 28
103 28
104 HOLD
ACTUAL
Tot L~d Com~e~ve
Test
02/28/95 109000 3860
03/21/95
03/21/95
HOLD
cur~g Mea~=d rrest Me~d IStandard s' x 12' Engine~'/'r~ni~an
~M C al 1,~1'~ c 3~ KEVIN TUCKER
Remarks ~d/~ Distn'ou~n
JoHN R. HORTON/JOHN R. HORTON (1), W. B. KIBLER CC
SAM CARDWELL (1), BILL FOWl{ES/BILL FOWl(ES (1), CI~
LARRY DAVIS
RoneEn 'neers
JPurchase Order
%aport Date
MARCH 1~ 1995
I Oor~ ~e Temperature ('F)
77
SPI;OIFiOATIONS
SPEiOIFiOATION$
(p=')
4000
NSTRucTIoN/
Y OF COPPELL/
Rone Engineers