Loading...
Latter-day-LR 950301 (3)Rone Engineers Geotechnical Consultants Materials Testing Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS lNumber " Jl:)ateofObse~on D4-251B-01-29424-C I FEB. 21, 1995 JOHN R. HORTON, ARCHITECT PAVING - 100' W. X 75' N. OF SOUTHEAST CORNER W. B. KIBLER CONSTRUCTION. ~lix Number jMix Description 8273 Weather Conditions CLF3LR jAmbient Temperature CF) 33me Sampled t Water Added 3~53 PM I 15.0 GALS Physical Data · ACTUAL " SLUMP (in..) AIR ENTRAINMENT (%) Concrete Cylinder Test(s) 4 4.8 No. I (Days) 101 7 102 28 103 28 104 HOLD ACTUAL Tot L~d Com~e~ve Test 02/28/95 109000 3860 03/21/95 03/21/95 HOLD cur~g Mea~=d rrest Me~d IStandard s' x 12' Engine~'/'r~ni~an ~M C al 1,~1'~ c 3~ KEVIN TUCKER Remarks ~d/~ Distn'ou~n JoHN R. HORTON/JOHN R. HORTON (1), W. B. KIBLER CC SAM CARDWELL (1), BILL FOWl{ES/BILL FOWl(ES (1), CI~ LARRY DAVIS RoneEn 'neers JPurchase Order %aport Date MARCH 1~ 1995 I Oor~ ~e Temperature ('F) 77 SPI;OIFiOATIONS SPEiOIFiOATION$ (p=') 4000 NSTRucTIoN/ Y OF COPPELL/ Rone Engineers