Loading...
Latter-day-LR 950301 (4)Rone Engineers Geotechnicai Consultants Materials Testing Concrete Cylinder Test Report Projec~ CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS .- JDate of Obsen,~lion Number D4-251B-01-29424-D t FEB. 21t 1995 To JOHN R. HORTON, ARCHITECT PAVING - 45' W. X 20' N. OF SOUTHEAST CORNER W. B. KIBLER CONSTRUCTION. I iTruck Suppaer P--~ 1 / 472 TXI Mix Number IMix Descripaon 8273 I ,Veal~er Conditions RoneEn ir Purchase Order Report Date MARCH 1 CLEAR '[qme Sampled I Water Added 5:.35 PM I 10.0 GALS I ,a~nl:~ent Temperature 71 I'ricket 338669 ete Temperature (°F) 74 Physical Data · ACTUAL '- SFECIFICATIONS 4 1/2 5.2 SLUMP (in.) AIR ENTRAINMENT (%) Concrete Cylinder Test(s) " ACTUAL SPECIFICATiONS Test Date I 02/28/95 03/21/95 03/21/95 HOLD stmng~ Required 98000 3470 4000 1995 Rone E~glneers KEVIN TUCKER sPeCimen I Age 105 7 106 28 107 28 108 HOLD )NSTRUCTION/ ?Y OF COPPELL/ :udng M~.~ IT~t Me~.~d Ist=~=~ 6'x 1~ ~ c 3~ 1~ c ~ J~a 28~ ~. ~ ~ ~/or ~ JO~ R. HORTON/JO~ R. HORTON (1), W. B. KIBL~ CC S~ C~WELL (1), BILL FO~ES/BILL FO~ES (1), CI~ ~ DAVZS (~-)