Latter-day-LR 950301 (5)Rone Engineers
Geotechnical Consultants
Materials Testing
Concrete Cylinder Test Report
Project
:HURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
Number -' Date of Observation
)4-251B-01-29443 FEB. 22~ 1995
To
JOHN HORTON ARCHITECT
Location
PAVING 70' S. X 80' W. OF SOUTHEAST CORNER OF BUILD:
W. B. KIBLER CONSTRUCTION
Supplier IPlant Truck
TXI 41 384
Mk Numar JM~ Desc~p~on
8273
Wea~er Conditions
PARTLY CLOUDY
RoneEn 'neers
IAmbient Temperature (~F)
I
~me Sampled I Water Added
12:45 PM I 0.0 GALS
Physical Data
SPI
IPurchase Order
~epon Date
MARCH 1~ 1995
:NG
T~cket
339303
Temperature ('F)
73
:_CIFICATIONS
SL~MP ( in. ).
Concrete Cylinder Test(s)
.ACTUAL
4 1/2
Specimen Age Test Date
No. (Days)
109 7 03/01/95
110 28 03/22/95
111 28 03/22/95
112 HOLD HOLD
ACTUAL
Tot Load ! I Compressive St~eng~
(lbs.)} O:sO
100000{ 3540
Cudng Method JTest Method {Standa;'cl 6' x 12'
ASTM C 31 {ASTM C 39 IArea 28.27 scl. in.
SPE
SAMMY MCLAIN
:CIFICAT]ONS
~trength Required
4000
Rone Engineers
Rernau~s ~d/~ Dis'~u'don
JoHN R. ~ORTON/JOHN R. HORTON (1), ~. B. ~IBLER Cm
SAM CARDWELL (1), BILL FOW-KES/BILL FOWKES (1), CIT]
LARRY DAVIS (1)
[STRUCTION/
OF COPPELL/
w~ hive no cOnlTOI. OU~ le(~e~'J ~Ula I'ep~ ahl for ~'te e'z~u~Y~ ule (~ ~~le dle~ whofft _1~ i*1 .