Loading...
WA9302-LR 951228[EOTECH N ICAL E I GEE Consultants, Inc. EiNViRONMENTAL 2540 Glenda Lane , Suite 108 · Dallas, Texas 75229 , (214) 620-9791 · Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: December 28, 1995 Date Concrete Placed: December 9, 1995 Standard 6"x12" Client: City of Coppell Area 28.27 Square Inches Project: 6.0 Million Gallon Water Storage Tank concrete Report No.: 48 Contractor: Natgun Construction Project No.: 95-0196 Concrete Supplier and Plant: RediMix Concrete - Plant #1 Location of Placement: Slab of Storage Tank MATERIALS s ....., ~.~,h ~. INSPECTION DATA Description (Lbs./Cu. Yd) Mix Number: Mix A Time Sample Batehe& 10:29 am Cement: Time Sampled: 11:10 am Sample Location: F-18 Fly Ash: TmekfFicket No: 106/16209 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 32°F Fine Aggregate: Concrete Range: 48°F Slump Range (inches): 3 t,4" Admixtures: Weather Conditions: Overcast 1 Super plastieizer Time Started: 5:30 am 2 Time Completed: 9:00 pm Added Water: Sample Air Content (%): 3% Total Cubic Yards Placed: 72 C.Y. Required Strength (Lbs./sq.in.): 5,000 specimen Measured Age Date Total Load Compre. ssive Strength Remarks Number Slump (in.) (Days) Tested CLbs.) (Lbs./Sq. In.) CWT 193 3 ~" 8 12/17/95 146,500 5, 180 CWT 194 3 ~A" 28 01/06/96 CWT 195 3 tA" 28 01/06/96 Test Methods Utilized Fracture Regular Cylinders Mad~ By: G.K. ASTM C-31 ,C-39,C-I 43 (Unless Noted Oth~nlse) Return'ks and/or Distribution: co: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendricks - ShimeL lacobs and FinIdea /~~/~d & ~ ~ line_ Reviewed by: '