Latter-day-LR 950301 (6)Rune Engineers
Geotechnical Consultants
Materials Testing
Concrete Cylinder Test Report
Project
C__~JRCH OF JESUS CHRIST OF LATTER-DAY SAINTS
.- IDate of Ob~erva~on
~umber
D4-251B-01-29443-A IFEB. 22~ 1995
To
JOHN HORTON ARCHITECT
Loca~on
35' W. X 40' S. OF SOUTHEAST CORNER OF BUILDING IN
Cont3'a~or
W. B. KIBLER CONSTRUCTION
Supplier
TZI
Mix Number IMix Descdp~on
I
Neather Conditions
PARTLY CLOUDY
Time Sampled I Water Added
2:35 PM I 0.0 GALS
· ACTUAL '-
6 1/2
SP~
Physical Data
SLUMP (in.)'
Concrete Cylinder Test(s)
· '" ACTUAL SPE
Test Date
Tot Load
(z~.)
Compressive
I
108000 3820
SpeclrnenJ Age
No. I (~ys)
113 7
114 28
115 28
116 HOLD
03/01/95
03/22/95
03/22/95
HOLD
RoneE
IPurchase Order
eport Date
MARCH 1, 1995
~ARKING AREA
IT~cket
339465
Temperature (°F)
68
iCIF1CAT1ONS
ClFICATIONS
~STM C at tAS'rM C ss IArea 28.27 sq. in. I SA.N~4~'· MCLAIN
· eng~h Required
ineers
4000
rSTRUCTION/
~rnark$ ~d~r O~ln~ufion
JOHN R. HORTON/JOHN R. HORTON (1), W. B. KIBLER CO!
SAM CARDWELL (1), BILL FOWKES/BILL FOWKES (1), CIT3
LARRY DAVIS
OF COPPELL/
Rune Engineers~