Latter-day-LR 950302Rone Engineers, Inc.
Geotechnical Consultants
Materials Testing
REPORT OF FIELD INSPECTION OF CONCRETE
ineers.
TESTED FOR: JOHN R. HORTON PROJECT: CHURCH OF JESUS CHRIST F LATTER-DAY SAINTS
REPORT DATE: 3/2/95
SAMPLE DATE: 2/24/95 OUR REPORT NO. D4251B-048
FIELD DATA:
Water ~ Air Ambient Concrete
No
of
Concrete
Set Cylinders Supplier Ticket Time Truck Time Truck Yards of Added Slump ! Content Temp Temp
No Made Number Batched Unloaded Concrete, (Gal) i (In) ! (%) °F . °F
35 4 340868 8:18 8:50 10 ' 10 4 1/4! ! 5.7 69 68
/
36 ~ 4 I 340934 8:48 i 9:31 10 - 4 1/4 5.3 69 70
LOCATION: , ,
35 Paving - 40, South & 60,, East of Northeast Corner of Building
36 ! Paving - 70 West & 40 North of Southwest Corner of Building
TECHNICIAN: Kevin Tucker
REMARKS:
DISTRIBUTION: DISTRIBUTION: JOHN R. HORTON/JOHN R. HORTON (1), W.B. KIBLER CONSTRU~"I'ION/SAM CARDWELL (1), BILL
FOWKES/BILL FOWKES (1 I, CITY OF-COPPELL/LARRY DAVIS (1)
I Rone Engineers, Inc.