Loading...
Latter-day-LR 950302Rone Engineers, Inc. Geotechnical Consultants Materials Testing REPORT OF FIELD INSPECTION OF CONCRETE ineers. TESTED FOR: JOHN R. HORTON PROJECT: CHURCH OF JESUS CHRIST F LATTER-DAY SAINTS REPORT DATE: 3/2/95 SAMPLE DATE: 2/24/95 OUR REPORT NO. D4251B-048 FIELD DATA: Water ~ Air Ambient Concrete No of Concrete Set Cylinders Supplier Ticket Time Truck Time Truck Yards of Added Slump ! Content Temp Temp No Made Number Batched Unloaded Concrete, (Gal) i (In) ! (%) °F . °F 35 4 340868 8:18 8:50 10 ' 10 4 1/4! ! 5.7 69 68 / 36 ~ 4 I 340934 8:48 i 9:31 10 - 4 1/4 5.3 69 70 LOCATION: , , 35 Paving - 40, South & 60,, East of Northeast Corner of Building 36 ! Paving - 70 West & 40 North of Southwest Corner of Building TECHNICIAN: Kevin Tucker REMARKS: DISTRIBUTION: DISTRIBUTION: JOHN R. HORTON/JOHN R. HORTON (1), W.B. KIBLER CONSTRU~"I'ION/SAM CARDWELL (1), BILL FOWKES/BILL FOWKES (1 I, CITY OF-COPPELL/LARRY DAVIS (1) I Rone Engineers, Inc.