Latter-day-LR 950302 (3)Rone Engineers, Inc.
Geotechnical Consultants
Materials Testing
'"' Ro eEngineers'
REPORT OF FIELD INSPECTION OF CONCRETE
TESTED FOR: JOHN R. HORTON PROJECT: CHURCH OF JESUS CHRIST (;rF LATTER-DAY SAINTS
REPORT DATE: 3/2/95
SAMPLE DATE: 2/22/95 OUR REPORT NO. D4251B-039
FIELD DATA:
No of Concrete Water Air Ambient Concrete
Set Cylinders Supplier Ticket Time Truck Time Truck Yards of Added Slump Content Temp Temp
No Made Number Batched Unloaded Concrete (Gal) (In) (%) °F °F
28 4 339303 12:26 12:30 60 4 1/2 - 75 73
29 4 339465 2:15 2:40 120 6 1/2 - 74 68
LOCATION:
28 Paving - 70' South & 80' West of Southeast Corner of Building
29 Paving - 35' West & 40' South of Southeast Corner of Building
:TECHNICIAN: Kevin Tucker
REMARKS:
DISTRIBUTION: DISTRIBUTION: JOHN R. HORTON/JOHN R. HORTON (1), W.B. KIBLER CONSTRUCTION/SAM CARDWELL (1), BILL
FOWKES/BILL FOWKES (1), CITY OF COPPELL/I.ARRY DAVIS (1)
Rone Engineers, Inc.