Latter-day-LR 950306Rone Engineers
Geotechnical Consultants
Materials Testing
Concrete Cylinder Test Report
Project
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
Number -'
D4-251B-01-29489
ID'ate of Observation
FEB. 27, 1995
Roi
IPumhase Order
:~eport Date
MARCH 6, 1995
JOHN R. HORTON, ARCHITECT
PAVING - 75' W. X 15' S. OF NORTHWEST CORNER OF BUILDING
W. B. KIBLER CONSTRUCTION .
Supplier
Mix Number JMix Description
8273
I
iAmbient Temperature (~F') IC, o~n
Weather Conditions
PARTLY CT,OUD¥
IWater Added 10.0 GALS
Time Sampled
7:.48 AM
,
ce Temperature
72
Physical Data
· ACTUAL '- SPI;CIFICATIONS
SLUMP (in.) 4 1/2
Specimen I Age
No. I (Day~)
137 7
138 28
139 28
140 HOLD
Concrete Cylinder Test(s)
" ACTUAL SPE !CIFICATIONS
Tot Load Comprees/ve Seeng~ ;tmng~ Required
'lest Dat.
Co=')
99000 3500
03/06/95
03/27/95
03/27/95
HOLD
:During Method Fe~t Method IStandarcl 6' x 12' JEngineer/~'__ec~__ician
~T~ C a~ tASTM C as I.~'ea ~e.~7 sq. in. I KEVIN TUCKER
~ ~d/~ Distn'bution
JOH~ ~. ~OR~O~/JOZ'~ R. ~O~TO~ (1)~ ~. B. KI~Lg~ COl
SAM CARDWELL (1), BILL FOWKES/BILL FOWKES (1), CIT'
LARRY DAVIS (1)
4000
Rone Engineers
lineers
~STRUCTION/
6 OF COPPELL/