Loading...
Latter-day-LR 950306Rone Engineers Geotechnical Consultants Materials Testing Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Number -' D4-251B-01-29489 ID'ate of Observation FEB. 27, 1995 Roi IPumhase Order :~eport Date MARCH 6, 1995 JOHN R. HORTON, ARCHITECT PAVING - 75' W. X 15' S. OF NORTHWEST CORNER OF BUILDING W. B. KIBLER CONSTRUCTION . Supplier Mix Number JMix Description 8273 I iAmbient Temperature (~F') IC, o~n Weather Conditions PARTLY CT,OUD¥ IWater Added 10.0 GALS Time Sampled 7:.48 AM , ce Temperature 72 Physical Data · ACTUAL '- SPI;CIFICATIONS SLUMP (in.) 4 1/2 Specimen I Age No. I (Day~) 137 7 138 28 139 28 140 HOLD Concrete Cylinder Test(s) " ACTUAL SPE !CIFICATIONS Tot Load Comprees/ve Seeng~ ;tmng~ Required 'lest Dat. Co=') 99000 3500 03/06/95 03/27/95 03/27/95 HOLD :During Method Fe~t Method IStandarcl 6' x 12' JEngineer/~'__ec~__ician ~T~ C a~ tASTM C as I.~'ea ~e.~7 sq. in. I KEVIN TUCKER ~ ~d/~ Distn'bution JOH~ ~. ~OR~O~/JOZ'~ R. ~O~TO~ (1)~ ~. B. KI~Lg~ COl SAM CARDWELL (1), BILL FOWKES/BILL FOWKES (1), CIT' LARRY DAVIS (1) 4000 Rone Engineers lineers ~STRUCTION/ 6 OF COPPELL/