Loading...
Latter-day-LR 950306 (2)Rone Eng'ineers Geotechnical Consultants Materials Testing Concrete Cylinder Test Report Projec~ CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Number .' D4-251B-01-29489-A IDate of Observation FEB. 27, 1995 RoneEn ineers Order :,eport Date MARCH 6, 1995 JOHN R. HORTON, ARCHITECT PAVING - 40' W. X 60' S. OF NORTHWEST CORNER OF BUILDING Column. or W. B. KIBLER CONSTRUCTION TXI Mix Number IM[x Descripaon 8273 PARTLY CLOUDY I Water Added 8:50 AM 15.0 GALS Physical Data · ACTUAL JAmbient Temperature ifF) 68 SLUMP (in.) 4 1/4 Concrete Cylinder Test(s) ACTUAL iSpecimen Age I Tot Load C~mi:zm~iv~ Strength No. (Days) Te~t DateI (lbs.) 101000 3520 141 7 03/06/95 142' 28 03/27/95 143 28 03/27/95 144 HOLD HOLD C 3, IA~ C ss J~a ;s~ ~. ~ ~ K~IN TUCKER ~ ~d/~ ~n JO~ R. HORTON/JO~ R. HORTON (1), W. B. KIBL~ CO~ S~ C~WELL (1), BILL FO~ES/BILL FO~ES (1), CIT3 ~Y DAVIS (1) Our I,l~al'l i~C:I l'eoor~ are fsi' ~le e'x"'4~,J~vl, u~l of ate ~ to 'v~hoflt I~llq/iii Ig~lZllle<t. ITk'ket 341830 I Cor~.,re ~e Temperature (0. 74 SPEiCIFICATIONS SPECIFICATIONS ~ Irength Recluired 4000 rSTRUCTION/ OF COPPELL/ Rone Eflgineers