Latter-day-LR 950306 (2)Rone Eng'ineers
Geotechnical Consultants
Materials Testing
Concrete Cylinder Test Report
Projec~
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
Number .'
D4-251B-01-29489-A
IDate of Observation
FEB. 27, 1995
RoneEn ineers
Order
:,eport Date
MARCH 6, 1995
JOHN R. HORTON, ARCHITECT
PAVING - 40' W. X 60' S. OF NORTHWEST CORNER OF BUILDING
Column. or
W. B. KIBLER CONSTRUCTION
TXI
Mix Number IM[x Descripaon
8273
PARTLY CLOUDY
I Water Added
8:50 AM 15.0 GALS
Physical Data
· ACTUAL
JAmbient Temperature ifF)
68
SLUMP (in.) 4 1/4
Concrete Cylinder Test(s)
ACTUAL
iSpecimen Age I Tot Load C~mi:zm~iv~ Strength
No. (Days) Te~t DateI (lbs.)
101000 3520
141 7 03/06/95
142' 28 03/27/95
143 28 03/27/95
144 HOLD HOLD
C 3, IA~ C ss J~a ;s~ ~. ~ ~ K~IN TUCKER
~ ~d/~ ~n
JO~ R. HORTON/JO~ R. HORTON (1), W. B. KIBL~ CO~
S~ C~WELL (1), BILL FO~ES/BILL FO~ES (1), CIT3
~Y DAVIS (1)
Our I,l~al'l i~C:I l'eoor~ are fsi' ~le e'x"'4~,J~vl, u~l of ate ~ to 'v~hoflt I~llq/iii Ig~lZllle<t.
ITk'ket
341830
I Cor~.,re ~e Temperature (0.
74
SPEiCIFICATIONS
SPECIFICATIONS
~ Irength Recluired
4000
rSTRUCTION/
OF COPPELL/
Rone Eflgineers