Latter-day-LR 950306 (4)Rone Engineers
Geotechnical Consultants
Materials Testing
Concrete Cylinder Test Report
Project
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
D4-251B-01-29464
IDateofO~e~
FEB. 24, 1995
RoneEn lineers
IPurchase Order
~eport Date
MARCH 6~ 1995
JOHN R. HORTON, ARCHITECT
PAVING - 40' S. X 60' E. OF NORTHEAST CORNER OF BUILDING
W. B. KIBLER CONSTRUCTION
I , ITruck
SupplierTXi P~I 1467
Mix Number jMix Descrip~on
8273
Time Sampled
8 :A5 AM
IWater Added 10.0 GALS
ITicket
340868
te Temperature
6'8
Physical Data
· ACTUAL '- SPli':ClFiCATIONS
4 1/4
5.7
SLUMP (in.)
AIR ENTRAINMENT (%)
Concrete Cylinder Test(s)
"' ACTUAL SPE :CIRCA'i'IONS
Test Date Compresaive Strength :treng~ Required
Tot Load
SpecimenI AgeI
No. (Days)
I
129 7 03/03/95
130 28 03/24/95
131 28 03/24/95
132 HOLD HOLD
Curing Method Fast Me~'~od
As'r~ c3~ IASTMC3S
105000 3710
Engineer/T~
KEVIN TUCKER
flone Engineers
Remarks and/or O~tn~m~on
JOHN R. HORTON/JOHN R. HORTON (1), W. B. KIBLER CO]
SAM CARDWELL (1), BILL FOWKES/BILL FOWKES (1), CIT:
LARRY DAVIS (1)
4000
;STRUCTION/
OF COPPELL/