Loading...
Latter-day-LR 950306 (4)Rone Engineers Geotechnical Consultants Materials Testing Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS D4-251B-01-29464 IDateofO~e~ FEB. 24, 1995 RoneEn lineers IPurchase Order ~eport Date MARCH 6~ 1995 JOHN R. HORTON, ARCHITECT PAVING - 40' S. X 60' E. OF NORTHEAST CORNER OF BUILDING W. B. KIBLER CONSTRUCTION I , ITruck SupplierTXi P~I 1467 Mix Number jMix Descrip~on 8273 Time Sampled 8 :A5 AM IWater Added 10.0 GALS ITicket 340868 te Temperature 6'8 Physical Data · ACTUAL '- SPli':ClFiCATIONS 4 1/4 5.7 SLUMP (in.) AIR ENTRAINMENT (%) Concrete Cylinder Test(s) "' ACTUAL SPE :CIRCA'i'IONS Test Date Compresaive Strength :treng~ Required Tot Load SpecimenI AgeI No. (Days) I 129 7 03/03/95 130 28 03/24/95 131 28 03/24/95 132 HOLD HOLD Curing Method Fast Me~'~od As'r~ c3~ IASTMC3S 105000 3710 Engineer/T~ KEVIN TUCKER flone Engineers Remarks and/or O~tn~m~on JOHN R. HORTON/JOHN R. HORTON (1), W. B. KIBLER CO] SAM CARDWELL (1), BILL FOWKES/BILL FOWKES (1), CIT: LARRY DAVIS (1) 4000 ;STRUCTION/ OF COPPELL/