Loading...
Latter-day-LR 950306 (5)Rone Eng'ineers Geotechnical Consultants Materials Testing Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS INumber ,: JDate of Observ~lion D4-251B-01-29464-A IFEB. 24t 1995 Ron IPurchase Order qeport Date To JOHN R. HORTON, ARCHITECT Loca~on PAVING - 70' W. X 40' N. OF SOUTHWEST CORNER OF BUIi'.DING W. B. KIBLER CONSTRUCTION Supplier IPlant ~ruck TXI I 41 455 Mix Number IMix Description 8273 I Weather Conditions I Ambient Temperature CF) 69 CLT_J~R Time Sampled 9:25 AM IWater Added 0.0 GALS Physical Data · ACTUAL '- 4 1/2 5.3 SLUMP (in.)· AIR ENTRAINMENT (%) Concrete Cylinder Test(s) ACTUAL Test Date I Tot Load Compre~ive Strength I Specimen I Age No. I (Days) 133 7 134 28 135 28 136 HOLD I 115000 4070 03/03/95 03/24/95 03/24/95 HOLD Curing Method Fe~t Me'~.od IStandard ~ c 3~ tAs'r~ c r::ng~erfrechn~,n KEVIN TUCKER Remarks ~d/or Dia'a~n JOHN R. HORTON/JOHN R. NORTON (l), W. B. KIBLER COS SAM CARDWELL (1), BILL FOWKES/BILL FOWKES (1), CIT% LARRY DAVIS (1-) ITmket 340934 I Concrl ~e Temperature ifF) 7O SPI-'CIFICATIONS SPEiCIF1CAT1ONS ;trenCh Required 4000 rSTROC~ION/ OF COPPELL/ Rone Engineers neers