Latter-day-LR 950306 (5)Rone Eng'ineers
Geotechnical Consultants
Materials Testing
Concrete Cylinder Test Report
Project
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
INumber ,: JDate of Observ~lion
D4-251B-01-29464-A IFEB. 24t 1995
Ron
IPurchase Order
qeport Date
To
JOHN R. HORTON, ARCHITECT
Loca~on
PAVING - 70' W. X 40' N. OF SOUTHWEST CORNER OF BUIi'.DING
W. B. KIBLER CONSTRUCTION
Supplier IPlant ~ruck
TXI I 41 455
Mix Number IMix Description
8273
I
Weather Conditions
I Ambient Temperature CF)
69
CLT_J~R
Time Sampled
9:25 AM
IWater Added 0.0 GALS
Physical Data
· ACTUAL '-
4 1/2
5.3
SLUMP (in.)·
AIR ENTRAINMENT (%)
Concrete Cylinder Test(s)
ACTUAL
Test Date I Tot Load Compre~ive Strength
I
Specimen I Age
No. I (Days)
133 7
134 28
135 28
136 HOLD
I
115000 4070
03/03/95
03/24/95
03/24/95
HOLD
Curing Method Fe~t Me'~.od IStandard
~ c 3~ tAs'r~ c
r::ng~erfrechn~,n
KEVIN TUCKER
Remarks ~d/or Dia'a~n
JOHN R. HORTON/JOHN R. NORTON (l), W. B. KIBLER COS
SAM CARDWELL (1), BILL FOWKES/BILL FOWKES (1), CIT%
LARRY DAVIS (1-)
ITmket
340934
I Concrl ~e Temperature ifF)
7O
SPI-'CIFICATIONS
SPEiCIF1CAT1ONS
;trenCh Required
4000
rSTROC~ION/
OF COPPELL/
Rone Engineers
neers