Latter-day-LR 950307Rone Engineers
Geotechnical Consultants
Materials Testing
Concrete Cylinder Test Report
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
Number ': IDate of Observation
D4-251B-01-29456 tFEB. 23, 1995
JOHN R. HORTON, ARCHITECT
RoneEn rineers
IPurchase Order
Report Date
MARC}{ 7t 3.995
PARKING AREA - 50' W. X 85' S. OF SOUTHWEST CORNER OF BUILDING
Coll.-actor
W. B. KIBLER CONSTRUCTION
Mix Number JMix Description
5.5
I
jArnt~ient Temperature CF)
59
Weather Conditions
PARTLY CLOUDY
Sampled I Water Added
.25 AM 0.0 GALS
Physical Data
-ACTUAL "
SLUMP (in.). 6 1/2
Concrete Cylinder Test(s)
J Tot Load
0bs.)
C~mpre~ive Strengl~
96000 3400
(Days) TestDate
117 7 03/02/95
118 28 03/23/95
119 28 03/23/95
120 HOLD HOLD
~r~ cal IASTM C aS
dard6'x 12'
'~-~ lm~i~SAMMY MCLAIN
JOHN R. HORTON/JOHN R. HORTON (1), W. B. KIBLER CO]
SAM CARDWELL (1), BILL FOWKES/BILL FOWKES (1), CIT'
LARRY DAVIS (1)
pcket
339811
ICor~ct .=te Temperature (.~"')
64
SPECIFICATIONS
SPI-'ClFICATIONS
Strength Required
4000
~STRUCTION/
OF COPPELL/
Rone Engineers