Latter-day-LR 950307 (3)Rune Engineers
Geotechnical Consultants
Materials Testing
Concrete Cylinder Test Report
Pr~ect
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
~um~r -' ]DateotObservmion IF
D4-251B-01-29456-B IFEB. 23, 1995
To
JOHN R. HORTON, ARCHITECT
RoneEn
IPurchase Order
eport D~e
MARCH 7f 1995
CURB - EAST AND 85' NORTH OF SOUTHEAST CORNER OF BU[LDING
W. B. KIBLER CONSTRUCTION .
Mix Number JMix Descfip~on
I
IAmbient Temperature ifF)
'75
Weather Conditions
PARTLY CLOUDY
']'~3ket
40203
Temperature (*F)
67
T~ne Sampled
11.: 27 AM
IWater Added 10.0 GALS
Physical Data
· ACTUAL " SPECIFICATIONS
SLUMP (in.) 3 3/4
Concrete Cylinder Test(s)
Test Date
125 7 03/02/95
126 28 03/23/95
127 28 03/23/95
128 HOLD HOLD
Tot Load
(rs.)
SPE
122000 4320
JOHN R. HORTON/JOHN R. HORTON (1), W. B. KIBLER CO~
SAM CARDWELL (1), BILL FOWKES/BILL FOWKES (1), CIT]
LARRY DAVIS (1)
CIRCA'nONS
4000
S UCTION/
OF COPPELL/
Rune Engineers
ineers