Loading...
Latter-day-LR 950307 (5)Rone Engineers Geotechnical Consultants Materials Testing Concrete Cylinder Test Report CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Date of Observation iF FEB. 7, 1995 RoneE IPurchase Order Number -: D4-251B-01-29317-A eportDate MARCH 7, 1995 JOHN R. HORTON, ARCHITECT SLAB - WEST SIDE OF POUR #3 30' S X 15' E OF NORTHW]~ST CORNER W. B. KIBLER CONSTRUCTION Mix Number IM~ Description 45 I CLOUDY Sampled ITk:ket 330477 e Temperature (°F) {51 IWater Added 0.0 GALS Physical Data · ACTUAL " SPE:CIFICATIONS SLUMP (in.) 4 1/2 neers Concrete Cylinder Test(s) " ACTUAL SPECiFICATIONS iSpecimen Age Tot Load Compressive Stmng~ S ~'.ngth Required No. (Days) Test Da~e 01~.) (1~ (p.a') 3000 73 7 02/14/95 89000 3150 74 28 03/07/95 118000 4170 75 28 03/07/95 121000 4280 76 HOLD HOLD Mmnod Fest Melf~3d JStanda~l ~' x 12' IAST~C~ I~'"'~ '"' ~ KEVIN TUCKER /~ ~n JOHN R. HORTON/JOHN R. HORTON (1), W. B. KIBLER CON SAM CARDWELL (1), BILL FOWKES/BILL FOWKES (1), CITY LARRY DAVIS ( 1~ STRUCTION/ OF COPPELL/ Rone Engineers w~e bawl no ¢~n~r~. (~ lo,em an~ re~ are fo~ ~'le elc~srve ,Joe ot Ule ~ ~0 wflo~ ~ey am 8ddresle~.