Loading...
Latter-day-LR 950307 (6)Rone Engineers Geotechnica[ Consultants Materials Testing CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Number -' II)ate of Observation D4-251B-O1-29498 IFEB. 28~ 1995 Concrete Cylinder Test Report Purchase (:Xder ~po~Date MARCH 7 1995 'Fo JOHN R. HORTON, ARCHITECT Loca~on PAVING - 20' N X 35' E OFF SOUTHWEST CORNER OF PAR~ING LOT W. B. KIBLER CONSTRUCTION 'Supplier JPlant . ~mck TxI I 41 ! 388 Mix Number JMix Descrip~on 8273 Weather Conditfons jAmbi~nt Temperature CF) '1 48 CLOUDY ~meSampl~ IWa~rA~ 7:25 AM 12.0 GALS Physical Data · ACTUAL '- SLUMP (in.). 4 Concrete Cylinder Test(s) ACTUAL Specimen I Age Tot Load Compressive Slmng~ (Days) (r~,) No. i Test Date 149 7 03/07/95 150 28 03/28/95 151 28 03/28/95 152 HOLD HOLD 114500 4050 Curing Method [Test Method Standard 6' x 12' Engine~/-Fectmician ASTM C S~ ~ASTM C SS Area zs~ sq. ~ TIM DUKE JOHN R. HORTON/JOHN R. HORTON (1), W. B.' KIBLER SAM CARDWELL (1), BILL FOWKES/BILL FOWKES (1), CIT' LARRY DAVIS (2) T'~ket 42648 I Cor~ ere Temperature (op--) 58 SPECIFICATIONS SP:--CIFICATIONS 4000 ~STRUCTION/ ~ OF COPPELL/ Rone Engineers