Latter-day-LR 950308Rone Engineers
Geotechnical Consultants
Materials Testing
Concrete Cylinder Test Report
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
D4-251B-01-29292
Date of Observ~lion
FEB. 2, 1995
To
JOHN R. HORTON, ARCHITECT
RoneE
IPurchase Order
Report Date
MARCH 8~ 1995
Lo<mOon
SLAB ON GRADE - 2ND POUR 50'N & 22'E OF BUILDING C()RNER
W. B. KIBLER CONSTRUCTION.
TXI 1 385 ~;__7808
Mix Number IM~< Description
45
Weather Conditions ~Ambient Temperature CF)
CLEAR 'I 65
nme Sampled I Water Added
11:30 AM I 0.0 GALS
Physical Data
· ACTUAL
SLUMP (in.) 5 1/4
Specimen I Age
No. I (Days)
Concrete Cylinder Test(s)
ACTUAL
Test Date
65 7 02/09/95
66 28 03/02/95
67 28 03/02/95
68 HOLD HOLD
T~Load(ibs.) iC°m~essiveStrencJ~
88000 3110
116000 4100
119000 4210
ASTMCuring cMeth~ 31 IASTM pest Method C 39 IlAma Istandam 2e.2'/~. x I~ ~' rlEngineer~echnici~ MIKE
FULLER
Remark~ ~d/~ Distn"ou'don
JOHN R. HORTON/JOHN R. HORTON (1), W. B. KIBLER CC
SAM CARDWELL (1), BILL FOWKES/BILL FOWKES (1), CIT
LARRY DAVIS (t)
I Cor~cr, .,ts Temperature (°F)
66
SP:-CIFICATIONS
SP~:ClFICATIONS
31~ength Required
3000
NSTRUCTION/
Y OF COPPELL/
ineers
Rone Engineers