Latter-day-LR 950308 (2)Rone Eng'ineers
Geotechnical Consultants
Materials Testing
Concrete Cylinder Test Report
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
D4-251B-01-29292-A
To
JOHN R. HORTON, ARCHITECT
Date of Observation
FEB. 2, 1995
Loca~on
SLAB ON GRADE 2ND POUR - 27' WEST & 5' NORTH OF S.E
W. B. KIBLER CONSTRUCTION
Supplier
Mix Number IMix Description
45
~/eather Conditions
CLEAR
IWater Added 0.0 GALS
Temperature
79
]3me Sampled
1:00 PM
Physical Data
· ACTUAL"
SLUMP (in.)- 5 1/2
Concrete Cylinder Test(s)
ACTUAL
Test Date
Tot Load
(rs.)
Specimen
NO.
77
78
79
80
Compressive Strengtt~
(Days)
7 02/09/95 82000 2900
28 03/02/95 100000 3540
28 03/02/95 104000 3680
HOLD HOLD
ASTMC3~ IASTMC~ Iamazs~'"'Z~'~ I MIKE FULLER
Rema~ and/~
JOHN R. HORTON/JOHN R. HORTON (1), W. B. KIBLER COt
SAM CARDWELL (1), BILL FOWKES/BILL FOWKES (1), CIT%
LARRY DAVIS
RoneEn lineers
~eport Date
MARC]'[ 8 ~ 1995
BLDG. CORNER
I Cor~re te Tempera~re (°8
69
SP[~CIFICA~ONS
SPE;CIFICA~ONS
3000
STRUCTION/
OF COPPELL/
Rone Engineers