Loading...
Latter-day-LR 950308 (3)Rone Engineers, Inc. Geotechnical Consultants Materials Testing REPORT OF FIELD INSPECTION OF CONCRETE neEn ineers'. TESTED FOR: JOHN R. HORTON PROJECT: CHURCH OF JESUS CHRIST )F LATTER-DAY SAINTS REPORT DATE: 3/8/95 SAMPLE DATE: 2/27/95 OUR REPORT NO. D4251B-051 FIELD DATA: No of Concrete Water Air Ambient Concrete Set Cylinders Supplier Ticket Time Truck Time Truck Yards of Added Slump Content Temp Temp No Made Number Batched Unloaded Concrete (Gal} (In) {%) °F °F 37 4 341712 7:00 7:55 50 10 4 1/2 - 64 72 38 4 341830 8:24 8:57 110 15 4 1/4 - 68 74 39 4 341940 9:27 10:35 210 10 4 1/2 75 74 LOCATION:' 37 Paving, 75' West and 15' South of Northwest Corner of Building 38 Paving, 40' West and 60' South of Northwest Corner of Building 39 Paving, 30' North and 25' East of Northeast Corner of Building TECHNICIAN: Kevin Tucker REMARKS: DISTRIBUTION: John R. Horton/John R. Horton (1), W.B. Kibler Construction/Sam Cardwell (1), Bill Fowkes/Bill Fowkes (1), City of Coppell/Larry Davis {1} ' ' Rone Engineers, Inc.