Latter-day-LR 950314Rone Engineers
Geotechnicai Consultants
Materials Testing
Concrete Cylinder Test Report
Project
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
Number -: JDate of Observa~on
D4251B-026I 02-10-95
RoneE
JOHN R. HORTON
Loca~on
8TH BLOCK FROM SOUTHEAST CORNER - 6 ROWS HIGH
ineers
~r$~or
W.B. KIBLER CO~TRUCTTON
SupplieroN SITE IPlant
'M~ Number IM~ Oescd¢on FILLER GROUT
Weather Conditfons
CLEkR
l~me Sampled
· 9:18 AM
IAmbiem Temperature CP") ICor~re
Water Added
IPurchase Order
leport Date
03--14--95
ITicket
~e Tempermure (~,~
62
~Physical Data
· ACTUAL " SPE;CIFICAT1ONS
GROUT CYLINDERS
Concrete Cylinder Test(s)
"' SPECIFiCATiONS
~pe~Jmet"l
No.
I Tot Load(~os.) IC<)mpm~aive StTength ~0
IA 7 12000 1700
lB 28 20000 2830
lC 28 21750 3080
Test Date
02/17/95
03/10/95
03/10/95
IEng~~~EVIN TUCKER'
Curing Method Test Method J 3 x 6 C~m.
~ C 31 ~ C 39 7.0~
Remarks and/or Dism'bulJon
DISTRIBO'TION: JOH:N R. HORTON/JOHN R. HORTO~ (1)
CONSTRUCTION/SAM CARDWELL (1) , BILL FOWKES/BILL FOW.
S ~"englJl Required
675
, W.B. KIBLER
<ES (1)
. Rone Engineers