JConcrete Cylinder Test Report
Project
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
Number .' IDate of Observa~on
D4-251B-01-29372 IFEB. 13, 1995
JOHN R. HORTON, ARCHITECT
SLAB - 70' WEST X 30' SOUTH OF NORTHEAST CORNER
W. B. KIBLER CONSTRUCTION
Number IMix Description
45
Conditions
CLOUDY/LT. RAIN
RoneEn
IPurchase Order
I Ambient Temperature
34
JWa~r Added 15.0 GALS
:=,eport Da~e
MARCH 14, 1995
SLUMP (in.).
..m Temperature
49
Sampled
28 ~
Physical Data
· ACTUAL " SPi--CIFICATIONS
4 1/4
ACTUAL
Concrete Cylinder Test(s)
Tot Load
Obs.)
comPre~v~ ~
T~'t Dal~
SPt
Specimen Age
No. (Days)
81 7
82 28
83 28
84 HOLD
-'ClF1CATIONS
3000
Jneers
02/20/95 lZl000 3890
03/13/95 136000 4810
03/13/95 135000 4780
HOLD
IASTM c 35 j~a~ea 2..27 sq. in.,Er~neer
/or
JO~ R. HORTON/JO~ R. HORTON (1), W. S. KIBLER
S~ C~WELL (1), BILL FO~ES/BILL FO~ES (1), CIT'
~Y DAV~S__L! )
Rone Engineers
~STRUCTION/
{ OF COPPELL/