Latter-day-LR 950316Rone Engineers, Inc.
Geotechnical Consultants
Materials Testing
REPORT OF FIELD INSPECTION OF CONCRETE
TESTED FOR: JOHN R. HORTON PROJECT: CHURCH OF JESUS CHRIST O LATTER-DAY SAINTS
REPORT DATE: 3/16/95
SAMPLE DATE: 3/15/95 OUR REPORT NO. D4251B-057
FIELD DATA:
No of Concrete Water ! Air Ambient Concrete
Set Cylinders Supplier Ticket Time Truck Time Truck Yards of I Added Slump IContent Temp Temp
No Made Number Batched Unloaded Concrete (Gal) {In) ! (%) °F °F
/
41 i 4 347691 9:05 , 10 15 4 I 2.5 63 , 65
LocATION:
41 Platform Slab - 10' W. x 8' S. of northeast corner
i
TECHNICIAN: Kevin Tucker
REMARKS:
DISTRIBUTION: DISTRIBUTION: J.OHN R. HORTON/JOHN R. HORTON (1), W.B. KIBLER CONSTRUC~TION/SAM CARDWELL (1), BILL
FOWKES/BILL FOWKES (1), CITY OF'COPPELL/LARRy DAVIS (1)
IRone ~ngineers, Inc.