Loading...
Latter-day-LR 950316Rone Engineers, Inc. Geotechnical Consultants Materials Testing REPORT OF FIELD INSPECTION OF CONCRETE TESTED FOR: JOHN R. HORTON PROJECT: CHURCH OF JESUS CHRIST O LATTER-DAY SAINTS REPORT DATE: 3/16/95 SAMPLE DATE: 3/15/95 OUR REPORT NO. D4251B-057 FIELD DATA: No of Concrete Water ! Air Ambient Concrete Set Cylinders Supplier Ticket Time Truck Time Truck Yards of I Added Slump IContent Temp Temp No Made Number Batched Unloaded Concrete (Gal) {In) ! (%) °F °F / 41 i 4 347691 9:05 , 10 15 4 I 2.5 63 , 65 LocATION: 41 Platform Slab - 10' W. x 8' S. of northeast corner i TECHNICIAN: Kevin Tucker REMARKS: DISTRIBUTION: DISTRIBUTION: J.OHN R. HORTON/JOHN R. HORTON (1), W.B. KIBLER CONSTRUC~TION/SAM CARDWELL (1), BILL FOWKES/BILL FOWKES (1), CITY OF'COPPELL/LARRy DAVIS (1) IRone ~ngineers, Inc.