Latter-day-LR 950322 (3)Rone Engineers
Geotechnical Consultants
Materials Testing
RoneEn,g, ..
Concrete Cylinder Test Report
Proiect IPurchase Order
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
I Date of Observation iF
FEB. 22f 1995
Number ';
D4-251B-01-29443-A
To
JOHN R. HORTON, ARCHITECT
Loca~on
35' W. X 40' S. OF SOUTHEAST CORNER OF BUILDING IN
Contractor
W. B. KIBLER CONSTRUCTION.
epon Date
HARCH 22
PARKING AREA
IT~cket
339465
Temperature (°~
68
CIFICAT1ONS
Supplier
TXI
Mix Number Mix Descripton
6/ea'dler Conditions Ambiem Temperature
PARTLY CLOUDY ' 74
Time Sampled j Water Added
2:35 PMt 0.0 GALS
Physical Data
· ACTUAL" SPE
SLUMP (in..) 6 1/2
Concrete Cylinder Test(s)
" ACTUAL SPECIFICATIONS
j Tot
Load I Compressive
Specimen j, Age 1
(Days) ~
No. J Test Date
113 7 03/01/95
114 28 03/22/95
115 28 03/22/95
116 HOLD HOLD
4000
Curing Method Fest Me.od
ASTM C 31 JASTM C 39
i
108000 3820
135500 4790
131000 4630
JE~gin"r~S,~' MCLAIN
Reman~ and/or Oistnbu~on
JoHN ~. ao~zoa/~o~ ~. ~o~zoa (z), ~. ~. ~zs~ co:
S~ C~WELL (1), BILL FO~ES/BI~ FO~ES (1), CIT
~Y DAVIS (1)
Rone Engineers
~STRUCTION/
¢ OF COPPELL/