Loading...
Latter-day-LR 950323 (06)Rone Engineers Geotechnical Consultants Materials Testing Concrete Cylinder Test Report CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS .: IDle of O~erva~on D4-251B-01-29424 I FEB. 21~ 1995 JOHN R. HORTON, ARCHITECT PAVING - 30' E. X 10' N. OF SOUTHWEST CORNER W. B. KIBLER CONSTRUCTION. M~Num~r8273 IM~Descrip6°n CLEAR IWater Added 15.0 GALS RoneEn,g, Order :~el:~rt Date MARCH 23 1995 J'13cket 338100 Temperature (°~ 72 Physical Data · ACTUAL " SPi;CIFICATIONS SLUMP (in..) AIR ENTRAINMENT (%) 5 5.5 Concrete Cylinder Test(s) " ACTUAL SPf I 02/28/95 95000 ' 3360 03/21/95 125000 4420 03/21/95 130000 4600 HOLD Specimen Age [ No. (Days) 89 7 90 28 91 28 92 HOLD IEngineer/':r_ _echg_ ician KEVIN TUCKER R. HORTON/JOHN R. HORTON (1), W. B. KIBLER CC SAM CARDWELL (1), BILL FOWKES/BILL FOWKES (1), CIH LARRY DAVIS (1). -'CIFiCATIONS Streng~ R~:luired 4000 NSTRUCTION/ Y OF COPPELL/ Rone Engineers ,