Latter-day-LR 950323 (10)Rone Engineers
Geotechnical Consultants
Materials Testing
Concrete Cylinder Test Report
~--~
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
~ IDate of Ol:~e~on
]
D4-251B-01-29424-D IFEB. 21, 1995
jR
To
JOHN R. HORTON, ARCHITECT
PAVING - 45' W. X 20' N. OF SOUTHEAST CORNER
Con~-ac~or
W. B. KIBLER CONSTRUCTION.
Supplier TXI
RoneEn 'neers
Mix Number IMix Description
8273
Weather CondiUons
IWater Added 10.0 GALS
jPurchase Order
:x)rt Date
~4A]~4 '23: 1995
338669
~ Temperature (°.~
74
CLEAR
Time Sampled
5:;35 PM
lambent Temperature CF) ICor~et
I 71
1
Physical Data
· ACTUAL " SPEClFICATIONS
4 1/2
5.2
SLUMP (in.)
AIR ENTRAINMENT (%)
Concrete Cylinder Test(s)
" ACTUAL SPE CIFIOATIONS
I ~t ~ I Compressive S~ng~
Test DUe 0m.) ~
02/28/95 98000 3470
03/21/95 125000 4420
03/21/95 130000 4600
HOLD
SpecimenI Age
No. I (Oa~)
105 7
106 28
107 28
108 HOLD
renglJl Required
4000
rSTRUCTION/
OF COPPELL/·
KEVIN TUCKER
Curing Method Fest MelJ'~=d I
~-"I'M C 31 1ASTM C 39 I '
=[ema~= and/or Dis~n'bu~on
JOHN R. HORTON/JOHN R. HORTON (1), W. B. KIBLER CO~
SAM CARDWELL (1), BILL FOWKES/BILL FOWKES (1), CIT%
LARRY DAVIS
Rone Engineers