Loading...
Latter-day-LR 950331Reno Engineers Geotechnical Consultants Materials Testing --., Ro eEngineers: Concrete Cylinder Test Report IPlrchase Order Rlport Date Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Number Date of Observation 03/31/95 D42518-049 FEB. 24, 1995 To JOHN R. HORTON, ARCHITECT Location PAVING - 40'S X 60'E OF NORTHWEST CORNER OF BUILDING Contractor W. B. KIBLER CONSTRUCTION Supplier TXI Mix Number 8273 Weather Conditions CLEAR i Time Sampled I Water Added 8:45 AM I 10.0 GALS IPlant I Truck 41 467 Mix Description I-ri, :ket 3z,0868 Distribution: Curing Method I Test Method ASTM C 31I ASTM C 39 Remarks and/or Distribution 35A 7 3/03/95 105000 358 28 3/24/95 146000 35C 28 3/24/95 143000 35D HOLD HOLD ACTUAL Specimen Age ' Test Date , Tot Load Compressive No. (Days)I I (lbs.) Strength (psi) Physical Data ACT UA L S PE£:I FI CATION S SLUMP (in.) -- 4 112" ENTRAINED AIR (%) -- 5.7% Concrete Cylinder Test(s) SPE( Stren rncrete Temperature (°F) ~8 ;IFICATIONS :h Required (psi) 3710 4000 5160 5060 IStandard 6" x 12" I Engineer/Technician Area 28.27 sq. in. KEVIN (1) --JOHN R. HORTON (1) -- W.B. KIBLER .CONSTRUCTION (1) -- BILL FOWKES (1) -- CITY OF COPPELL LIMITATIONS: The teet recite preaented herein were ixepired baaed upon the specific eamplee provided for t#flng. We a#ume n quality (compo~ition, appeirence, performance, etc.] of any othir feetu~e of eimilir eubject matter provided by pereon~ or conditione Out letter, and reports ~re for the exciueive u~e of the clientl to whom they Ire Iddre#ed. c:\wpwin\forms\c¥1inder.rpt-95/kjh TUCKER = reepor~ibility for virietion in ever which we have ne control. March 31, 1995 Ambient69 Temperature (°F) I C(i