Loading...
Latter-day-LR 950331 (2)Rone Engineers Geotechnical Consultants Materials Testing Ro eEngineers · Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Number IPlrchase Order Rl art Date D4251B-050 IDate of Observation FEB. 24,1995 To JOHN R. HORTON, ARCHITECT Location PAVING - 70'W X 40'N OF SOUTHWEST CORNER OF BUILDING Contractor W. B. KIBLER CONSTRUCTION SupplierTXl IPlant41 ITM455 ITi'3~ Mix Description Mix Number 8273 Weather Conditions CLEAR Time Sampled I Water Added 9:25 AM I 0.0 GALS Physical Data Ambient69 Temperature (°F) 03/31/95 ;ket O934 ~ncrete Temperature {°F) '0 ACTUAL S PE(: :1 FICATION S SLUMP (in.) -- 4 1/4" ENTRAINED AIR (%) -- 5.3% Concrete Cylinder Test(s) ACTUAL S PE(::I FI CATION S Stren Specimen I Age ITestDatel TotLoad I Compressive No. (Days) (lbs.) Strength (psi) 36A 7 3/03/95 115000 36B 28 3/24/95 141000 36C 28 3/24/95 148000 36D HOLD HOLD Curing Method I Test Method ASTM C 31I ASTM C 39 Remarks and/or Distribution Standard 6" x 12" I Area 28.27 sq. in. I Distribution: (1) --JOHN R. HORTON (1) -- W.B. KIBLER CONSTRUCTION (1) -- BILL FOWKES (1) -- CITY OF COPPELL 4070 4000 4990 5230 Engineer/Technician KEVIN th Required (psi) LIMITATIONS: The te~t r#ult~ prelented herein ware prepared baaed upa1 the specific lample~ provided for t#ting. Wa a#ume r~ quality (compoakion0 appeerance, performance, etc.) or any other feature of limilar lubject metier provided by perlon~ or conditiorm Our latterl and reporta are for the exclwive use of the clienta to whom they era addresled. rUCKER retpor~ibility f~r verialion in